<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Unfair Competition 보관 - Atlas Legal Blog</title>
	<atom:link href="https://atlaw.kr/en-blog/category/corporate/unfair-competition/feed/" rel="self" type="application/rss+xml" />
	<link></link>
	<description></description>
	<lastBuildDate>Mon, 26 Oct 2026 08:41:57 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://atlaw.kr/en-blog/wp-content/uploads/sites/3/2025/09/cropped-cropped-폴더-상단-직사각형-32x32.png</url>
	<title>Unfair Competition 보관 - Atlas Legal Blog</title>
	<link></link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Copying a Supplier&#8217;s Unpatented Technology in South Korea: Supreme Court Rejects a Fixed 10-Year Limit on Protection Against Misappropriation</title>
		<link>https://atlaw.kr/en-blog/achievement-misappropriation-protection-period-south-korea/</link>
		
		<dc:creator><![CDATA[법무법인 아틀라스]]></dc:creator>
		<pubDate>Mon, 26 Oct 2026 08:41:43 +0000</pubDate>
				<category><![CDATA[Unfair Competition]]></category>
		<category><![CDATA[misappropriation of results]]></category>
		<category><![CDATA[technology supply disputes]]></category>
		<category><![CDATA[trade secret injunction period]]></category>
		<category><![CDATA[unfair competition prevention act]]></category>
		<category><![CDATA[unfair competition South Korea]]></category>
		<guid isPermaLink="false">https://atlaw.kr/en-blog/achievement-misappropriation-protection-period-south-korea/</guid>

					<description><![CDATA[<p>A 2026 Korean Supreme Court ruling refused to cap protection for a supplier's transformer design at 10 years. How Korea's misappropriation clause works.</p>
<p>게시물 <a href="https://atlaw.kr/en-blog/achievement-misappropriation-protection-period-south-korea/">Copying a Supplier&#8217;s Unpatented Technology in South Korea: Supreme Court Rejects a Fixed 10-Year Limit on Protection Against Misappropriation</a>이 <a href="https://atlaw.kr/en-blog">Atlas Legal Blog</a>에 처음 등장했습니다.</p>
]]></description>
										<content:encoded><![CDATA[<p><!--  -->



<!--  --></p>
<p><!-- ATLAS_SEO_BLOCK_START --><br />
<script type="application/ld+json">{"@context":"https://schema.org","@type":"Article","@id":"https://atlaw.kr/en-blog/achievement-misappropriation-protection-period-south-korea/#article","mainEntityOfPage":{"@type":"WebPage","@id":"https://atlaw.kr/en-blog/achievement-misappropriation-protection-period-south-korea/#webpage"},"headline":"Copying a Supplier's Unpatented Technology in South Korea: Supreme Court Rejects a Fixed 10-Year Limit on Protection Against Misappropriation","description":"The Supreme Court of Korea set aside a ruling that limited protection for a supplier's railway transformer design to 10 years (2024Da226825). This article explains Korea's catch-all misappropriation clause in the Unfair Competition Prevention Act, how long protection lasts, and what remedies are available.","datePublished":"2026-10-26T16:00:00+09:00","dateModified":"2026-10-26T16:00:00+09:00","inLanguage":"en-US","author":{"@type":"Person","@id":"https://atlaw.kr/taejin-kim/#person","name":"Taejin Kim","alternateName":"김태진","jobTitle":"Managing Partner","worksFor":{"@id":"https://atlaw.kr/#legalservice"}},"publisher":{"@type":"LegalService","@id":"https://atlaw.kr/#legalservice","name":"Atlas Legal","url":"https://atlaw.kr"},"about":["Misappropriation of achievements under the Korean Unfair Competition Prevention Act","Article 2(1)(pa) of the Korean Unfair Competition Prevention and Trade Secret Protection Act","Protection period for misappropriated technology in South Korea","Trade secret injunction periods in South Korea","Supreme Court of Korea, October 8, 2026, 2024Da226825"]}</script><br />
<script type="application/ld+json">{"@context":"https://schema.org","@type":"FAQPage","@id":"https://atlaw.kr/en-blog/achievement-misappropriation-protection-period-south-korea/#faqpage","inLanguage":"en-US","mainEntity":[{"@type":"Question","name":"Can technology that was never patented be protected under South Korean law?","acceptedAnswer":{"@type":"Answer","text":"Yes. Article 2(1)(pa) of the Unfair Competition Prevention and Trade Secret Protection Act treats as unfair competition the use of results that another person achieved through substantial investment or effort, for one's own business and without permission, in a manner contrary to fair commercial practices or competitive order, thereby infringing that person's economic interests. The Supreme Court of Korea has held that the protected \"results\" are not limited by type and may include outputs that were hard to protect under conventional intellectual property laws (Supreme Court of Korea, May 15, 2025, 2025Da202970). The party alleging misappropriation must prove that the requirements are met (Supreme Court of Korea, July 9, 2026, 2023Da290355 (main claim) and 2023Da290362 (counterclaim))."}},{"@type":"Question","name":"Our former customer in Korea is still selling products built from our drawings more than 10 years after our deal ended. Is it too late?","acceptedAnswer":{"@type":"Answer","text":"Not necessarily. In the railway transformer case, the Supreme Court of Korea set aside a lower court ruling that limited protection to 10 years from the first delivery. It found that transformers delivered long after those 10 years were still near-copies of the transformer originally supplied, and that, with no evidence the technology had entered the public domain, they were likely still a competitive result worth protecting (Supreme Court of Korea, October 8, 2026, 2024Da226825). The outcome may differ if the technology has become widely known or the other side developed it independently."}},{"@type":"Question","name":"Can misappropriation be reported as a crime in South Korea?","acceptedAnswer":{"@type":"Answer","text":"Misappropriation under item (pa) alone is not a criminal offense. Article 18(4)(i) of the Act excludes item (pa) from the unfair competition acts that are punishable. If the materials you handed over were technical information kept confidential, trade secret crimes (Article 18(1) and (2)) may also be considered."}},{"@type":"Question","name":"How are damages calculated if the infringer does not produce its accounting records?","acceptedAnswer":{"@type":"Answer","text":"Korean courts may presume the infringer's profit from sales figures and benchmarks such as the standard income rate in the National Tax Service's expense-rate notice. In the transformer case, the appellate court found that proving the loss was extremely difficult because the defendant had no accounting records, and still awarded KRW 806,811,264 by applying a standard income rate of 9.8% to KRW 8,232,768,000 in sales from the first three deliveries (Daejeon High Court, January 24, 2024, 2022Na13337). The Supreme Court upheld that amount while noting that parts of the lower court's reasoning were not entirely appropriate (Supreme Court of Korea, October 8, 2026, 2024Da226825). Cost savings from not buying a part can also count as the infringer's profit (Supreme Court of Korea, April 28, 2022, 2021Da310873)."}},{"@type":"Question","name":"Is every product that resembles a competitor's product a case of misappropriation?","acceptedAnswer":{"@type":"Answer","text":"No. Courts have refused protection for intuitive ideas, for elements that are already widely known in the field and typical of any tool with similar functions, and for technology in the public domain (Supreme Court of Korea, October 14, 2022, 2020Da268807; Supreme Court of Korea, July 9, 2026, 2023Da290355 (main claim) and 2023Da290362 (counterclaim); Supreme Court of Korea, May 15, 2025, 2025Da202970). A finding that the defendant built its product independently can also defeat a claim of unauthorized use (Supreme Court of Korea, October 14, 2022, 2020Da268807)."}},{"@type":"Question","name":"What about copying that happened before the misappropriation clause was enacted?","acceptedAnswer":{"@type":"Answer","text":"It can be pursued as a tort under the Civil Act. The Supreme Court of Korea held that using, without permission and contrary to commercial ethics or fair competition, results that a competitor built through considerable effort and investment is a tort under the Civil Act (Supreme Court of Korea, August 25, 2010, 2008Ma1541 (decision)). In the transformer case, the delivery ordered on March 26, 2013, before the clause took effect, was treated as a civil tort (Supreme Court of Korea, October 8, 2026, 2024Da226825)."}},{"@type":"Question","name":"Is the transformer case over?","acceptedAnswer":{"@type":"Answer","text":"Only in part. The Supreme Court of Korea sent the claims for injunction, destruction and damages relating to the deliveries ordered on May 11, 2021 back to the Daejeon High Court and dismissed the defendant's appeal (Supreme Court of Korea, October 8, 2026, 2024Da226825). The award of KRW 806,811,264 for the earlier deliveries stands, and the appellate court will decide the May 11, 2021 order again on remand."}}]}</script><br />
<script type="application/ld+json">{"@context":"https://schema.org","@type":["LegalService","LocalBusiness"],"@id":"https://atlaw.kr/#legalservice","name":"Atlas Legal","alternateName":["법무법인 아틀라스","Atlas Law Firm"],"url":"https://atlaw.kr/en/home-en/","telephone":"+82-32-864-8300","email":"info@atlaw.kr","priceRange":"$$$","address":{"@type":"PostalAddress","streetAddress":"B-2901, 323 Incheon Tower-daero","addressLocality":"Yeonsu-gu, Incheon","addressRegion":"Incheon Metropolitan City","postalCode":"22007","addressCountry":"KR"},"geo":{"@type":"GeoCoordinates","latitude":37.399438,"longitude":126.629812},"openingHoursSpecification":[{"@type":"OpeningHoursSpecification","dayOfWeek":["Monday","Tuesday","Wednesday","Thursday","Friday"],"opens":"09:00","closes":"18:00"}],"areaServed":[{"@type":"Country","name":"South Korea"},{"@type":"Place","name":"Songdo International Business District"},{"@type":"Place","name":"Cheongna International City"},{"@type":"Place","name":"Yeongjong International City"},{"@type":"Place","name":"Incheon"},{"@type":"Place","name":"Seoul Metropolitan Area"},{"@type":"Place","name":"Incheon Free Economic Zone (IFEZ)"}],"knowsAbout":["Unfair Competition in South Korea","Trade Secret Protection in South Korea","Technology Misappropriation Disputes in South Korea","Intellectual Property Litigation in South Korea","Supply and Subcontracting Disputes in South Korea","Corporate Disputes in South Korea","Incheon Free Economic Zone (IFEZ) Legal Services"],"serviceType":["Unfair Competition Litigation","Trade Secret Protection","Technology Licensing and Supply Agreements","Corporate Dispute Resolution","Legal Services for Foreign Companies"]}</script><br />
<!-- ATLAS_SEO_BLOCK_END --></p>
<style>@import url('https://cdn.jsdelivr.net/gh/orioncactus/pretendard@v1.3.9/dist/web/static/pretendard.css'); /* ── Kadence 테마 컨텐츠 폭 override ── */ :root { --global-content-narrow-width: 1290px !important; } .entry-content-wrap { max-width: 1290px !important; } *, *::before, *::after { box-sizing: border-box; margin: 0; padding: 0; } :root { --navy: #0a2540; --navy2: #1a3353; --wine: #722f37; --text: #1a1f36; --muted: #697386; --rule: #e3e8ee; } body { font-family: 'Pretendard', -apple-system, BlinkMacSystemFont, 'Apple SD Gothic Neo', sans-serif; background: #fff; color: var(--text); font-size: 18px; line-height: 1.82; -webkit-font-smoothing: antialiased; } /* ── 히어로 ── */ .hero { max-width: 1000px; margin: 0 auto; padding: 72px 48px 48px; text-align: center; } .category-tag { font-size: 11px; font-weight: 700; letter-spacing: 1.5px; text-transform: uppercase; color: var(--wine); display: block; margin-bottom: 20px; } .hero h1 { font-size: 44px; font-weight: 700; line-height: 1.22; color: var(--navy); margin-bottom: 28px; word-break: keep-all; } /* 히어로 제목 — h1 대신 사용 (테마 자동 h1과 중복 방지) */ .hero-title { font-size: 44px; font-weight: 700; line-height: 1.22; color: var(--navy); margin-bottom: 28px; word-break: keep-all; } .hero-meta { display: flex; align-items: center; justify-content: center; gap: 12px; padding-bottom: 40px; border-bottom: 1px solid var(--rule); } .hero-info { font-size: 13.5px; color: var(--text); line-height: 1.4; } .hero-info strong { color: var(--text); font-weight: 500; } /* ── 즉시 답변 박스 ── */ .direct-answer { background: #f6f9fc; border-left: 4px solid var(--navy); border-radius: 0; padding: 20px 24px; margin: 32px 0 40px; font-size: 17px; line-height: 1.75; color: var(--text); } /* ── 본문 ── */ .content { max-width: 1000px; margin: 0 auto; padding: 52px 48px 100px; } /* 목차 */ .toc-nav { margin-bottom: 60px; border: 1px solid #d0d5dd; border-radius: 6px; padding: 28px 32px; } .toc-label { font-size: 20px; font-weight: 700; color: var(--navy); margin-bottom: 14px; } .toc-nav ol { list-style: none; padding-left: 0; } .toc-nav ol li { display: flex; gap: 14px; align-items: baseline; padding: 6px 0; font-size: 17px; } .toc-nav ol li::before { content: none; } .toc-nav ol li a { color: var(--text); text-decoration: none; font-weight: 400; } .toc-nav ol li a:hover { color: var(--wine); } /* 리드·요약·컨텍스트 텍스트 */ .lead-text { font-size: 20px; font-weight: 400; color: var(--text); line-height: 1.8; margin-bottom: 24px; } .summary-text { font-size: 18px; color: var(--text); line-height: 1.8; margin-bottom: 20px; } .context-text { font-size: 17px; color: var(--text); line-height: 1.8; margin-bottom: 52px; } /* ── 제목 ── */ h2 { font-size: 30px; font-weight: 700; color: var(--wine); margin: 68px 0 16px; word-break: keep-all; } h3 { font-size: 17px; font-weight: 700; color: var(--wine); margin: 38px 0 10px; } p { font-size: 18px; color: var(--text); line-height: 1.82; margin-bottom: 18px; } /* 표 */ table { width: 100%; border-collapse: collapse; margin: 24px 0; font-size: 14px; } thead tr { background: #fff; } th { color: var(--navy); font-weight: 600; padding: 11px 16px; text-align: left; font-size: 16px; border-bottom: 2px solid var(--navy); } td { padding: 12px 16px; border-bottom: 1px solid var(--rule); color: var(--text); font-size: 16px; } tbody tr:hover { background: #f6f9fc; } /* 불릿 리스트 */ ul, ol:not(.toc-nav ol) { padding-left: 20px; margin-bottom: 16px; } li { font-size: 18px; line-height: 1.78; margin-bottom: 6px; color: var(--text); } /* 계산 공식 */ .formula { display: flex; align-items: center; gap: 8px; background: #f6f9fc; border: 1px solid var(--rule); border-radius: 8px; padding: 28px 24px; margin: 32px 0; flex-wrap: wrap; justify-content: center; } .f-item { text-align: center; padding: 12px 18px; background: #fff; border: 1px solid var(--rule); border-radius: 5px; } .f-result { background: #fff; border: 2px solid var(--navy); } .f-num { font-size: 22px; font-weight: 700; color: var(--navy); line-height: 1.2; } .f-result .f-num { color: var(--wine); } .f-label { font-size: 11px; color: var(--text); margin-top: 4px; } .f-op { font-size: 20px; color: var(--text); padding: 0 2px; font-weight: 300; } /* FAQ */ .faq-item { border-top: 1px solid var(--rule); padding: 22px 0; } .faq-item:last-of-type { border-bottom: 1px solid var(--rule); } .faq-q { font-size: 17px; font-weight: 600; color: var(--navy); margin-bottom: 8px !important; } .faq-item p:not(.faq-q) { font-size: 17px; color: var(--text); margin: 0; line-height: 1.75; } /* 마무리 문장 */ p.closing { font-size: 15.5px; color: var(--text); margin: 40px 0 0; padding-top: 32px; border-top: 1px solid var(--rule); } /* 저자 박스 */ .author-box { display: flex; align-items: center; gap: 14px; padding-top: 40px; margin-top: 40px; border-top: 1px solid var(--rule); } .author-avatar { width: 56px; height: 56px; border-radius: 50%; object-fit: cover; flex-shrink: 0; align-self: flex-start; } .author-text { flex: 1; } .author-name { font-size: 18px; font-weight: 600; color: var(--navy); } .author-meta { font-size: 13px; color: var(--text); margin-top: 2px; } .author-link { display: inline-block; margin-top: 8px; font-size: 15px; font-weight: 600; color: var(--wine); text-decoration: none; } .author-link:hover { text-decoration: underline; } .author-section-label { font-size: 15px; font-weight: 700; letter-spacing: 1px; text-transform: uppercase; color: var(--muted); margin-bottom: 8px; } .author-detail { font-size: 16px; color: var(--text); line-height: 1.7; margin-bottom: 1px; } @media (max-width: 640px) { body { font-size: 15px; } p { font-size: 15px; } li { font-size: 15px; } .hero { padding: 32px 14px 24px; } .hero h1 { font-size: 22px; } .hero-title { font-size: 22px; } .hero-info { font-size: 12px; } .content { padding: 28px 0 60px; } .toc-nav { margin-left: -14px; margin-right: -14px; border-radius: 0; border-left: none; border-right: none; padding: 12px 4px; margin-bottom: 28px; } .toc-label { font-size: 16px; } .toc-nav ol li { font-size: 14px; padding: 3px 0; } h2 { font-size: 20px; margin: 44px 0 10px; } h3 { font-size: 15px; margin: 24px 0 8px; } .lead-text { font-size: 16px; } .summary-text { font-size: 15px; } .context-text { font-size: 14px; } .formula { flex-direction: column; padding: 16px 12px; } .f-num { font-size: 18px; } th { font-size: 13px; padding: 8px 10px; } td { font-size: 13px; padding: 8px 10px; } .faq-q { font-size: 14px; } .faq-item p:not(.faq-q) { font-size: 14px; } .author-box { display: block; overflow: hidden; } .author-avatar { float: left; width: 36px; height: 36px; margin-right: 10px; border-radius: 50%; } .author-section-label { display: inline; font-size: 11px; letter-spacing: 0; margin: 0 3px 0 0; } .author-name { display: inline; font-size: 14px; } .author-detail { clear: both; font-size: 13px; line-height: 1.55; margin-top: 8px; margin-bottom: 1px; } .author-detail ~ .author-detail { clear: none; margin-top: 2px; } .author-link { clear: both; display: block; font-size: 13px; margin-top: 8px; } p.closing { font-size: 14px; } }</style>
<div class="hero">
  <span class="category-tag">Unfair Competition · Technology Disputes</span></p>
<div class="hero-title">Copying a Supplier&#8217;s Unpatented Technology in South Korea<br />Does Protection End After 10 Years?</div>
<div class="hero-meta">
<div class="hero-info">
      <strong>Taejin Kim</strong> · Managing Partner, Atlas Legal<br />
      Supreme Court of Korea, October 8, 2026, 2024Da226825 &nbsp;·&nbsp; Unfair Competition Prevention Act, Article 2(1)(pa)
    </div>
</p></div>
</div>
<div class="content">
<div class="direct-answer">
    <strong>Key answer:</strong> Under South Korean law, technology that is not protected by a patent, design registration or trade secret can still be protected if another business uses it without permission in a manner contrary to fair commercial practices or competitive order, where the technology resulted from substantial investment or effort (Unfair Competition Prevention and Trade Secret Protection Act, Article 2(1)(pa)). On October 8, 2026, in a case where a Korean company built transformers from a supplier&#8217;s railway transformer and drawings, the Supreme Court of Korea set aside a ruling that had limited protection to a uniform 10 years from the first delivery (Supreme Court of Korea, October 8, 2026, 2024Da226825). The clause sets no statutory protection period, and the Court looked at whether the later products were still near-copies and whether there was any evidence the technology had entered the public domain.
  </div>
<div class="toc-nav">
<p class="toc-label">Contents</p>
<ol>
<li><a href="#sec-1">1. If something is not patented, can it be copied freely in South Korea?</a></li>
<li><a href="#sec-2">2. What counts as a protected &#8220;result,&#8221; and what use is &#8220;unfair&#8221;?</a></li>
<li><a href="#sec-3">3. What about copying before the clause existed?</a></li>
<li><a href="#sec-4">4. How long does protection against misappropriation last?</a></li>
<li><a href="#sec-5">5. What happened in the transformer case?</a></li>
<li><a href="#sec-6">6. Why did the Supreme Court reject the 10-year limit?</a></li>
<li><a href="#sec-7">7. What remedies are available?</a></li>
<li><a href="#sec-8">8. What should companies do before handing over technology and drawings?</a></li>
<li><a href="#sec-9">9. What does this mean for foreign suppliers and companies in IFEZ?</a></li>
<li><a href="#sec-10">10. Frequently asked questions</a></li>
</ol></div>
<p class="lead-text">In 2010, a French transformer manufacturer signed a contract with a Korean electrical equipment company and custom-built transformers for electric multiple-unit railway cars. It also handed over drawings showing the shape, size, names and assembly of the parts, marked to the effect that they contained confidential information and could not be used without approval. From 2013 to 2023, the Korean company delivered transformers that were near-copies of that design to railway car makers and to the Korea Railroad Corporation.</p>
<p class="summary-text">The French manufacturer sued under the misappropriation clause of the Unfair Competition Prevention Act and, in the alternative, in tort under the Civil Act. The appellate court found misappropriation but held that technology-related results were protected only for 10 years from the first delivery in early 2011, and excluded the last order placed on May 11, 2021. On October 8, 2026, the Supreme Court of Korea set aside that part of the ruling (Supreme Court of Korea, October 8, 2026, 2024Da226825).</p>
<p class="context-text">Starting from that decision, this article explains how far Korea&#8217;s misappropriation clause protects technology, products and services that are not covered by patents or trade secrets. We reviewed the original texts of 14 Supreme Court decisions, 4 lower court decisions and the relevant statutes. It is written for companies that supply parts or equipment, share drawings with customers, or build products using materials received from business partners in South Korea.</p>
<p></p>
<h2 id="sec-1">If something is not patented, can it be copied freely in South Korea?</h2>
<p class="lead-text">No. Even results that are not protected as patents, designs, trademarks, copyrights or trade secrets may be protected under the misappropriation clause of the Unfair Competition Prevention and Trade Secret Protection Act if they are taken and used unfairly.</p>
<p>Article 2(1)(pa) of the current Act defines as unfair competition &#8220;any other act of using, for one&#8217;s own business and without permission, results achieved by another person through substantial investment or effort, in a manner contrary to fair commercial practices or competitive order, thereby infringing that person&#8217;s economic interests&#8221; (our translation). It comes last in a list of specific unfair competition acts such as passing off, false indications of origin and copying product configurations.</p>
<p>The Supreme Court of Korea calls this a &#8220;supplementary general clause.&#8221; In the 2026 decision, it confirmed that the clause protects newly emerging intangible results with economic value and compensates for the fact that legislators cannot list every type of unfair competition, so that courts can address new forms of unfair competition and reflect changing views of trade in a timely way (Supreme Court of Korea, October 8, 2026, 2024Da226825). It said the same in the golf course case (Supreme Court of Korea, March 26, 2020, 2016Da276467). The Court has also held that the protected &#8220;results&#8221; are not limited by type: they include intangible as well as tangible things, and may include new kinds of outputs that were hard to protect under conventional intellectual property laws (Supreme Court of Korea, May 15, 2025, 2025Da202970).</p>
<h3>The same clause appears as item (cha), (ka) or (pa)</h3>
<p>The clause was introduced in 2013 and moved twice as new items were inserted before it, so court decisions refer to it by the label in force at the time. The 2026 decision applied item (ka) as it stood before the amendment of December 7, 2021.</p>
<table>
<thead>
<tr>
<th>Period in force</th>
<th>Location of the misappropriation clause</th>
<th>Amending act</th>
</tr>
</thead>
<tbody>
<tr>
<td>Until January 30, 2014</td>
<td>No such clause (claims brought as civil torts)</td>
<td>—</td>
</tr>
<tr>
<td>January 31, 2014 – July 17, 2018</td>
<td>New Article 2(1)(cha)</td>
<td>Act No. 11963 of July 30, 2013</td>
</tr>
<tr>
<td>July 18, 2018 – April 19, 2022</td>
<td>Item (ka); an idea misappropriation clause became item (cha)</td>
<td>Act No. 15580 of April 17, 2018</td>
</tr>
<tr>
<td>April 20, 2022 – present</td>
<td>Item (pa); data misuse (item (ka)) and celebrity identity (item (ta)) clauses were added. Item (ta) took effect six months after promulgation</td>
<td>Act No. 18548 of December 7, 2021</td>
</tr>
</tbody>
</table>
<p></p>
<h2 id="sec-2">What counts as a protected &#8220;result,&#8221; and what use is &#8220;unfair&#8221;?</h2>
<p class="lead-text">Korean courts ask three questions: whether there is a &#8220;result&#8221; worth protecting, whether it was produced through &#8220;substantial investment or effort&#8221; and is not in the public domain, and whether the defendant used it without permission &#8220;in a manner contrary to fair commercial practices or competitive order.&#8221;</p>
<ol>
<li><strong>Result</strong> — courts consider the reputation or economic value of the output, the customer appeal embodied in it, and its weight and competitiveness in the relevant business field (Supreme Court of Korea, October 8, 2026, 2024Da226825).</li>
<li><strong>Substantial investment or effort</strong> — the investment or effort is assessed case by case against the practices and realities of the industry, and the economic interest infringed must not belong to the public domain that anyone may freely use (Supreme Court of Korea, October 8, 2026, 2024Da226825).</li>
<li><strong>Unfair use without permission</strong> — courts consider whether the parties compete or are likely to compete soon, what the commercial practices and competitive order of the industry are and whether they are fair, whether the defendant&#8217;s product or service can replace the result in the market, how well known the result is, and whether customers could be confused (Supreme Court of Korea, October 8, 2026, 2024Da226825; Supreme Court of Korea, March 26, 2020, 2016Da276467).</li>
</ol>
<p>The party alleging misappropriation bears the burden of proof. The Supreme Court of Korea held that the burden of proving unfair use without permission lies with the party claiming that the act is unfair competition under item (pa) (Supreme Court of Korea, July 9, 2026, 2023Da290355 (main claim) and 2023Da290362 (counterclaim)).</p>
<h3>Cases where protection was granted or denied</h3>
<table>
<thead>
<tr>
<th>Case</th>
<th>What was used</th>
<th>Outcome</th>
<th>What the courts relied on</th>
</tr>
</thead>
<tbody>
<tr>
<td>Golf course image<br />(Supreme Court of Korea, March 26, 2020, 2016Da276467)</td>
<td>Screen-golf 3D footage reproducing real golf courses almost exactly</td>
<td>Protected</td>
<td>Upheld the lower court&#8217;s finding that the overall image of a golf course, combining terrain, scenery and landscaping, is a result of the operators&#8217; substantial investment or effort</td>
</tr>
<tr>
<td>K-pop group photo book<br />(Supreme Court of Korea, March 26, 2020, 2019Ma6525 (decision))</td>
<td>Magazine supplement packed with photos of a group&#8217;s members, made without the agency&#8217;s permission</td>
<td>Protected</td>
<td>Getting permission or paying for celebrity names and photos is an industry practice, and the supplement could replace demand for the agency&#8217;s own photo books</td>
</tr>
<tr>
<td>Lifter drive unit drawings<br />(Supreme Court of Korea, April 28, 2022, 2021Da310873)</td>
<td>Drawings received for a safety certification review, given to a Chinese maker to build a substitute drive unit</td>
<td>Protected</td>
<td>Upheld the lower court&#8217;s finding that using the drawings beyond the purpose for which they were provided, and cutting the plaintiff out as supplier, was contrary to fair commercial practices</td>
</tr>
<tr>
<td>Advertising deliverables<br />(Supreme Court of Korea, July 23, 2020, 2020Da220607)</td>
<td>A new product name and ad storyboard used without paying the production fee</td>
<td>Protected</td>
<td>Under the contract, rights passed only on full payment, yet the deliverables were used without paying (idea misappropriation or misappropriation of results)</td>
</tr>
<tr>
<td>Roof box design<br />(Supreme Court of Korea, June 25, 2020, 2019Da282449)</td>
<td>A structure embedding crossbars in grooves in the base plate</td>
<td>Denied</td>
<td>Found no legal error in the lower court&#8217;s finding that the structure was not a result of substantial investment or effort</td>
</tr>
<tr>
<td>Online marketplace &#8220;grouping&#8221; service<br />(Supreme Court of Korea, October 14, 2022, 2020Da268807)</td>
<td>Showing similar products together on one page</td>
<td>Denied</td>
<td>Upheld findings that the idea was intuitive, merely put a traditional sales method online, and that the defendant appeared to have built its service independently</td>
</tr>
<tr>
<td>Vaccine conjugates<br />(Supreme Court of Korea, May 15, 2025, 2025Da202970)</td>
<td>Producing 13 individual conjugate substances used in a patented vaccine</td>
<td>Denied</td>
<td>Upheld the finding that producing the individual conjugates belongs to the public domain</td>
</tr>
<tr>
<td>University review service API<br />(Supreme Court of Korea, July 9, 2026, 2023Da290355 (main claim) and 2023Da290362 (counterclaim))</td>
<td>Review data and a data query API received under a business agreement</td>
<td>Set aside a finding of liability</td>
<td>The API contained only elements typical of any API with similar functions, and although the review data was a protected result, there was no evidence it had actually been used</td>
</tr>
</tbody>
</table>
<p>Even where materials were received in a business relationship, the outcomes differed. In the lifter drive unit case, the problem was using drawings of a device the plaintiff had developed for a purpose other than the one for which they were provided, and pushing the plaintiff out of the supply chain. In the review service case, the API consisted of ordinary elements and there was no evidence of actual use. In a misappropriation dispute, what matters more than &#8220;what was received&#8221; is whether it is commonplace in the industry, whether it was used for the purpose for which it was provided, and whether there is evidence of actual use.</p>
<p></p>
<h2 id="sec-3">What about copying before the clause existed?</h2>
<p class="lead-text">A damages claim can be brought as a tort under the Civil Act. The misappropriation clause took effect on January 31, 2014, but the Supreme Court of Korea had treated the same kind of conduct as a tort under Article 750 of the Civil Act before then.</p>
<p>The leading case involved a program that made another company&#8217;s advertisements appear on an internet portal&#8217;s pages. The Supreme Court held that using, for one&#8217;s own business and contrary to commercial ethics or fair competition, results that a competitor built through considerable effort and investment, thereby free-riding on that effort and investment and infringing the competitor&#8217;s legally protectable interests, is a tort under the Civil Act. It added that if the unauthorized use continues so that money damages alone cannot provide effective relief, and the victim&#8217;s interest protected by an injunction outweighs the resulting burden on the wrongdoer, the victim may also seek an injunction (Supreme Court of Korea, August 25, 2010, 2008Ma1541 (decision)). The 2013 amendment reflected the purpose of that decision in statute (Supreme Court of Korea, March 26, 2020, 2016Da276467).</p>
<p>As a result, one case may rely on different grounds for different periods. In the golf course case, the lower court treated the same conduct as a tort until January 30, 2014 and as a violation of the misappropriation clause from January 31, 2014, and the Supreme Court upheld that approach (Supreme Court of Korea, March 26, 2020, 2016Da276467). In the transformer case, the first transformer, ordered on March 26, 2013, was treated as a civil tort, and the second and third deliveries, ordered in 2017 and 2019, as misappropriation; the fourth delivery will be decided again on remand (Supreme Court of Korea, October 8, 2026, 2024Da226825). The appellate court assessed the damages for the first delivery at KRW 13,230,000 (Daejeon High Court, January 24, 2024, 2022Na13337).</p>
<p></p>
<h2 id="sec-4">How long does protection against misappropriation last?</h2>
<p class="lead-text">The statute sets no period. Patents and product configurations have statutory periods, and for trade secrets Korean courts set an injunction period case by case. Whether misappropriation should also have a period like trade secrets was the issue in this case.</p>
<table>
<thead>
<tr>
<th>Form of protection</th>
<th>Protection period</th>
<th>Basis</th>
</tr>
</thead>
<tbody>
<tr>
<td>Patent</td>
<td>From registration until 20 years after the filing date</td>
<td>Patent Act, Article 88(1)</td>
</tr>
<tr>
<td>Product configuration</td>
<td>3 years from the date the configuration took shape, such as by making a prototype</td>
<td>Unfair Competition Prevention Act, Article 2(1)(ja), proviso (1)</td>
</tr>
<tr>
<td>Trade secret</td>
<td>No statutory period; courts set an injunction period in each case</td>
<td>Supreme Court of Korea, February 13, 1998, 97Da24528 and others</td>
</tr>
<tr>
<td>Misappropriation of results</td>
<td>No statutory period</td>
<td>Unfair Competition Prevention Act, Article 2(1)(pa)</td>
</tr>
</tbody>
</table>
<h3>Product configurations: no injunction after 3 years</h3>
<p>The product configuration clause excludes copying of a configuration more than 3 years after it took shape, such as by making a prototype. Whether to grant an injunction is judged as of the close of argument at the fact-finding court, so if argument closed more than 3 years after the prototype date, no injunction can be granted. The Supreme Court of Korea set aside a ruling that had granted an injunction without examining this point (Supreme Court of Korea, June 28, 2018, 2018Da215893).</p>
<h3>Trade secrets: an injunction lasts as long as needed to remove the head start</h3>
<p>Trade secrets have no statutory period, but the Supreme Court of Korea has held that the purpose of an injunction is to prevent the infringer from unfairly profiting from the superior position of a head start or time savings over fair competitors, so an injunction must be limited to the time needed for that purpose (Supreme Court of Korea, February 13, 1998, 97Da24528). Relevant factors include the nature and difficulty of the technical information, the time and cost the owner spent to obtain it, the time other competitors would need to obtain it lawfully through independent development or reverse engineering, and a comparison with patent terms (Supreme Court of Korea, February 13, 1998, 97Da24528).</p>
<p>Once the protection period expires, the right to an injunction lapses. But if the end of the period cannot be determined, for example because others are unlikely to obtain the same technology lawfully, the court may decline to set an injunction period, and this is not a permanent ban: the enjoined party may later argue that the period has expired (Supreme Court of Korea, March 14, 2019, 2018Ma7100 (decision)). Even when an injunction is refused because the period has expired, damages for losses up to that point can still be awarded. In a navigation circuit design case, a ruling that fixed the end of the protection period around March 2012, denied the injunction and awarded damages up to that time was upheld (Supreme Court of Korea, September 10, 2019, 2017Da34981).</p>
<h3>Misappropriation: lower courts borrowed periods from other regimes</h3>
<p>Because the misappropriation clause has no period, lower courts have refused protection under it once the period of another regime had expired. The Busan High Court held that information whose trade secret protection period had expired could be regarded as having entered the public domain and rejected a misappropriation claim (Busan High Court, October 6, 2021, 2020Na57663), and the Seoul Central District Court held that selling products with the same configuration after the 3-year product configuration period was hard to regard as a use &#8220;contrary to fair commercial practices or competitive order&#8221; under the misappropriation clause (Seoul Central District Court, August 25, 2022, 2020Gahap518132).</p>
<p>The appellate court in this case took the same direction. Citing Supreme Court decisions on trade secret injunction periods, it reasoned that injunctions against unfair competition should, like trade secret injunctions, be limited to the time needed, and that technology-related results may be regarded as entering the public domain after a certain time, and it set the protection period at 10 years (Daejeon High Court, January 24, 2024, 2022Na13337). The Supreme Court did not accept that conclusion.</p>
<p></p>
<h2 id="sec-5">What happened in the transformer case?</h2>
<p class="lead-text">The case concerned transformers for electric multiple-unit railway cars ordered by the Korea Railroad Corporation. A railway car maker ordered transformers from a Korean electrical company (the defendant), which in turn engaged a transformer manufacturer headquartered in Lyon, France (the plaintiff) to build and supply them (Supreme Court of Korea, October 8, 2026, 2024Da226825; Daejeon District Court, June 9, 2022, 2021Gahap100797).</p>
<table>
<thead>
<tr>
<th>Date</th>
<th>Event</th>
</tr>
</thead>
<tbody>
<tr>
<td>April 27, 2010</td>
<td>Plaintiff and defendant sign a contract to build and supply railway transformers</td>
</tr>
<tr>
<td>Early 2011</td>
<td>Plaintiff supplies 16 transformers for cars with a design speed of 180 km/h (EMU-180)</td>
</tr>
<tr>
<td>May 25, 2012</td>
<td>Plaintiff receives an order for transformers for 150 km/h cars (EMU-150); by early 2013 it supplies 46 units and one sample</td>
</tr>
<tr>
<td>March 26, 2013</td>
<td>First delivery: defendant receives an order for one EMU-150 transformer from a railway car maker and delivers it</td>
</tr>
<tr>
<td>December 8, 2017</td>
<td>Second delivery: order for 2 units from the Korea Railroad Corporation, delivered October 4, 2018</td>
</tr>
<tr>
<td>October 7, 2019</td>
<td>Third delivery: order for 70 units from another railway car maker; 63 delivered by June 30, 2023</td>
</tr>
<tr>
<td>May 11, 2021</td>
<td>Fourth delivery: order for 89 units from the same maker; 2 delivered by August 31, 2023</td>
</tr>
</tbody>
</table>
<p>The plaintiff had given the defendant drawings showing the shape, size, names and assembly of the transformer parts, stating that they contained confidential information and that use without the plaintiff&#8217;s approval was prohibited. It sued for an injunction, destruction of the products and KRW 3,016,547,738 in damages (Supreme Court of Korea, October 8, 2026, 2024Da226825). The district court granted an injunction and destruction and awarded KRW 250,000,000 (Daejeon District Court, June 9, 2022, 2021Gahap100797). It found that the defendant appears to have disassembled the sample transformer received from the plaintiff in early 2013 and was thereby able to confirm its components, their connections and its design structure (Daejeon District Court, June 9, 2022, 2021Gahap100797).</p>
<h3>The appellate court: misappropriation, but only 10 years of protection</h3>
<p>The appellate court found that the transformer was a result of the plaintiff&#8217;s substantial investment or effort and that the defendant had made and sold near-copies using the plaintiff&#8217;s transformer and drawings without consent. It then set the protection period at 10 years from the plaintiff&#8217;s first delivery in early 2011, citing the roughly one year the plaintiff spent designing and building the transformer, the disclosure of the drawings around December 2012 after approval by the Korea Railroad Corporation, the defendant&#8217;s acquisition of the technology in a relatively short time around 2013, and the fact that railway transformers, once delivered in volume, see little demand until the next car order (Daejeon High Court, January 24, 2024, 2022Na13337).</p>
<p>It therefore enjoined the manufacture, sale and delivery of products under the October 7, 2019 contract and ordered their destruction, but held that deliveries under the contract of May 11, 2021, made after the protection period had ended, were not unfair competition (Daejeon High Court, January 24, 2024, 2022Na13337). Damages were calculated by applying the standard income rate from the National Tax Service&#8217;s expense-rate notice to the defendant&#8217;s sales from the first three deliveries (Daejeon High Court, January 24, 2024, 2022Na13337).</p>
<div class="formula">
<div class="f-item">
<div class="f-num">KRW 8,232,768,000</div>
<div class="f-label">Sales, deliveries 1–3</div>
</div>
<div class="f-op">×</div>
<div class="f-item">
<div class="f-num">9.8%</div>
<div class="f-label">Standard income rate</div>
</div>
<div class="f-op">=</div>
<div class="f-item f-result">
<div class="f-num">KRW 806,811,264</div>
<div class="f-label">Damages awarded</div>
</div>
</div>
<p>Total sales are KRW 135,000,000 for the first delivery, KRW 399,168,000 for the second and KRW 7,698,600,000 for the third; the 9.8% rate is 100% minus the 90.2% simple expense rate for locomotive and railway car parts manufacturing. Of the KRW 806,811,264, KRW 13,230,000 is for the civil tort (first delivery) and KRW 793,581,264 for misappropriation (second and third deliveries) (Daejeon High Court, January 24, 2024, 2022Na13337).</p>
<p></p>
<h2 id="sec-6">Why did the Supreme Court reject the 10-year limit?</h2>
<p class="lead-text">The Supreme Court of Korea held that it was difficult to say that the protection period for the plaintiff&#8217;s transformer could be limited uniformly, or that it had already expired at the time of the fourth delivery (Supreme Court of Korea, October 8, 2026, 2024Da226825). It gave six reasons.</p>
<ol>
<li><strong>Custom technology</strong> — the plaintiff built the transformer to order based on technology and know-how accumulated over many years, and its capabilities are broadly recognized in industry surveys and research papers.</li>
<li><strong>Use outside the contract</strong> — the defendant breached the contract, used the transformer&#8217;s technical information outside the contract&#8217;s purpose, and made near-copies.</li>
<li><strong>Competition and lost recovery</strong> — both companies make and supply railway transformers and compete; the defendant gained substantially while the plaintiff lost the chance to recover the value of the money and effort it invested.</li>
<li><strong>A shortcut</strong> — without using the information in that way, the defendant would have found it hard to acquire enough capability for EMU-150 transformers in a short time.</li>
<li><strong>No real difference between the third and fourth deliveries</strong> — the lower court put the third delivery inside the period and the fourth outside it, but their end dates were only about two months apart, the products were the same, and there was little change in the technology or the defendant&#8217;s capabilities in between.</li>
<li><strong>Still near-copies after 10 years</strong> — the transformers delivered under the fourth order through August 31, 2023 were still near-copies of the transformer first supplied in early 2011, and there was no evidence that it belonged to the public domain, so the transformer was likely still a competitive result worth protecting long after 10 years.</li>
</ol>
<p>Finding that the lower court had misunderstood the law on limiting the protection period for results and misjudged the facts, the Supreme Court set aside the claims for injunction, destruction and damages relating to the fourth delivery. Because it set aside the main claim on that point, it also set aside the inseparably linked alternative claim in tort (Supreme Court of Korea, October 8, 2026, 2024Da226825). The defendant&#8217;s appeal on the first three deliveries was dismissed, so the findings of misappropriation and tort, the injunction and destruction order, and the KRW 806,811,264 award stand. The Court added that parts of the lower court&#8217;s reasoning on the protection period and damages were not entirely appropriate (Supreme Court of Korea, October 8, 2026, 2024Da226825).</p>
<h3>What the decision says and what it does not</h3>
<ul>
<li>The Court did not say that misappropriation has no protection period at all. The question was whether a period could be imposed &#8220;uniformly&#8221; on this transformer and whether it had expired by the fourth delivery.</li>
<li>What the Court relied on was the situation at the time of the deliveries rather than the number of years elapsed: whether the products were still near-copies, whether there was evidence the technology had entered the public domain, and whether the technology or the defendant&#8217;s capabilities had changed.</li>
<li>The decision does not address whether information whose trade secret period has expired, or a product configuration more than 3 years old, can be protected under the misappropriation clause. The lower court decisions in section 4 concern those situations.</li>
<li>The scope of the injunction, destruction and damages for the fourth delivery will be decided again by the Daejeon High Court on remand.</li>
</ul>
<p></p>
<h2 id="sec-7">What remedies are available?</h2>
<p class="lead-text">A civil action can seek an injunction, destruction of infringing goods and damages. However, misappropriation is not a crime and enhanced damages do not apply, so depending on the facts, trade secret, idea misappropriation and subcontracting law claims should also be considered.</p>
<h3>Injunction, destruction and damages</h3>
<p>A party whose business interests are infringed or likely to be infringed by unfair competition may seek an injunction or preventive order, together with destruction of the goods that constitute the infringement and removal of the equipment used (Unfair Competition Prevention Act, Article 4(1) and (2)). A party who intentionally or negligently infringes another&#8217;s business interests and causes loss must pay damages (Article 5), and if business reputation has been damaged by intentional or negligent unfair competition, measures to restore it may also be sought (Article 6).</p>
<h3>Presumptions ease the burden of proving damages</h3>
<p>If the infringer profited from the infringement, that profit is presumed to be the plaintiff&#8217;s loss (Article 14-2(2)), and where proving the amount is extremely difficult by its nature, the court may award a reasonable amount based on the entire argument and the evidence (Article 14-2(5)). The Supreme Court of Korea has held that &#8220;profit received by the infringer&#8221; is not limited to profit from sales of infringing goods: if the infringer saved manufacturing costs by using another&#8217;s results without permission, the savings may count as its profit. In the lifter drive unit case, purchase-cost savings of KRW 1,142,000 per unit for 299 units, totaling KRW 341,458,000, were presumed to be the loss, and the infringer bears the burden of proving grounds to rebut the presumption (Supreme Court of Korea, April 28, 2022, 2021Da310873). In the advertising case, an award of KRW 50 million in reasonable damages, based on the time and labor costs invested and the extent to which the deliverables were used, was upheld (Supreme Court of Korea, July 23, 2020, 2020Da220607).</p>
<h3>What misappropriation alone does not provide</h3>
<table>
<thead>
<tr>
<th>Item</th>
<th>Misappropriation (item (pa))</th>
<th>Idea misappropriation (item (cha))</th>
<th>Trade secret infringement</th>
</tr>
</thead>
<tbody>
<tr>
<td>Injunction and destruction</td>
<td>Available (Article 4)</td>
<td>Available (Article 4)</td>
<td>Available (Article 10)</td>
</tr>
<tr>
<td>Enhanced damages for willful infringement</td>
<td>Not available</td>
<td>Up to 5 times the loss (Article 14-2(6))</td>
<td>Up to 5 times the loss (Article 14-2(6))</td>
</tr>
<tr>
<td>Criminal penalties</td>
<td>None (excluded in Article 18(4)(i))</td>
<td>None (excluded in Article 18(4)(i))</td>
<td>Yes (Article 18(1) and (2))</td>
</tr>
<tr>
<td>Administrative investigation and corrective recommendations</td>
<td>Not available (excluded in Articles 7(1) and 8)</td>
<td>Available</td>
<td>—</td>
</tr>
</tbody>
</table>
<p>The Fair Transactions in Subcontracting Act also prohibits a prime contractor from wrongfully using a subcontractor&#8217;s technical data for itself or a third party or providing it to a third party (Article 12-3(4)), and a prime contractor that violates this is liable for up to 5 times the loss (Article 35(2)(ii)). Where the Subcontracting Act has different provisions on matters including the misappropriation clause and the injunction and damages provisions, the Subcontracting Act governs (Unfair Competition Prevention Act, Article 15(2)).</p>
<p></p>
<h2 id="sec-8">What should companies do before handing over technology and drawings?</h2>
<p class="lead-text">In misappropriation litigation, the key questions are whether the materials were used for the purpose for which they were provided and whether the use was contrary to fair commercial practices. Recording the purpose and scope at the time of handover gives the court a basis for that judgment.</p>
<h3>For the party providing technology</h3>
<ul>
<li>Mark drawings and technical documents as confidential and prohibit unauthorized use. The drawings in this case carried such statements, and the Supreme Court noted them in its account of the facts (Supreme Court of Korea, October 8, 2026, 2024Da226825).</li>
<li>State in the contract the purpose and scope of use, a ban on other uses, return or destruction after the relationship ends, and liability for breach. In this case, the Supreme Court relied on the defendant&#8217;s use of the technical information outside the contract&#8217;s purpose (Supreme Court of Korea, October 8, 2026, 2024Da226825); in the lifter drive unit case, the lower court found that using the drawings beyond the purpose for which they were provided was contrary to fair commercial practices, and the Supreme Court upheld that finding (Supreme Court of Korea, April 28, 2022, 2021Da310873).</li>
<li>When supplying samples, consider restrictions on disassembly and reverse engineering. Disassembly of the sample transformer appears in the facts of this case (Daejeon District Court, June 9, 2022, 2021Gahap100797).</li>
<li>Also manage core technology as a trade secret. Misappropriation alone does not support criminal penalties or enhanced damages.</li>
<li>In a subcontracting relationship, the prime contractor must sign a confidentiality agreement by the date it receives technical data (Subcontracting Act, Article 12-3(3)), so make sure that agreement is in place.</li>
</ul>
<h3>For the party receiving and using technology</h3>
<ul>
<li>Keep drawings and samples received from business partners separate internally so they are not used to develop other products.</li>
<li>If you develop a similar product independently, keep records of how and when it was developed. A finding of independent development has defeated a claim of unauthorized use (Supreme Court of Korea, October 14, 2022, 2020Da268807).</li>
<li>The passage of time alone is not a safe harbor. The 2026 decision held that products delivered long after 10 years, if still near-copies of the original and with no evidence the technology had entered the public domain, are likely still a result worth protecting (Supreme Court of Korea, October 8, 2026, 2024Da226825).</li>
</ul>
<h3>When you discover copying</h3>
<ol>
<li>Identify the other side&#8217;s deliveries and their timing. As this case shows, the outcome can differ contract by contract, so organize deliveries by period.</li>
<li>Gather records of drawings sent, samples supplied, confidentiality markings and contracts.</li>
<li>Consider whether to plead misappropriation together with trade secret infringement, idea misappropriation, subcontracting law violations and, for conduct before the clause took effect, civil tort, as main and alternative claims.</li>
<li>If proving the loss is difficult, obtain sales data and use the presumption and reasonable-damages provisions.</li>
</ol>
<p></p>
<h2 id="sec-9">What does this mean for foreign suppliers and companies in IFEZ?</h2>
<p class="lead-text">The plaintiff in this case was a French manufacturer, and the Korean courts protected its transformer design under the misappropriation clause and, for the earliest delivery, as a civil tort. Foreign suppliers and companies operating in the Incheon Free Economic Zone (IFEZ), including Songdo International Business District, Cheongna International City and Yeongjong International City, often share drawings, samples and specifications with Korean partners, and the same rules apply to them.</p>
<ul>
<li>Foreign suppliers should treat the supply contract as the first line of defense: define the purpose of any drawings or samples, prohibit other uses and reverse engineering, and keep copies of what was sent and when.</li>
<li>If a Korean partner starts supplying its own version of your product, act on evidence of each order and delivery. The 2026 decision shows that a long gap since the original supply does not by itself end protection where the products remain near-copies (Supreme Court of Korea, October 8, 2026, 2024Da226825).</li>
<li>Because misappropriation is not a crime in Korea, consider whether the information also qualifies as a trade secret or whether subcontracting law applies before choosing between civil and criminal routes.</li>
</ul>
<p></p>
<h2 id="sec-10">Frequently asked questions</h2>
<div class="faq-item">
<p class="faq-q">Q. Can technology that was never patented be protected under South Korean law?</p>
<p>A. Yes. Article 2(1)(pa) of the Unfair Competition Prevention and Trade Secret Protection Act treats as unfair competition the use of results that another person achieved through substantial investment or effort, for one&#8217;s own business and without permission, in a manner contrary to fair commercial practices or competitive order, thereby infringing that person&#8217;s economic interests. The Supreme Court of Korea has held that the protected &#8220;results&#8221; are not limited by type and may include outputs that were hard to protect under conventional intellectual property laws (Supreme Court of Korea, May 15, 2025, 2025Da202970). The party alleging misappropriation must prove that the requirements are met (Supreme Court of Korea, July 9, 2026, 2023Da290355 (main claim) and 2023Da290362 (counterclaim)).</p>
</div>
<div class="faq-item">
<p class="faq-q">Q. Our former customer in Korea is still selling products built from our drawings more than 10 years after our deal ended. Is it too late?</p>
<p>A. Not necessarily. In the railway transformer case, the Supreme Court of Korea set aside a lower court ruling that limited protection to 10 years from the first delivery. It found that transformers delivered long after those 10 years were still near-copies of the transformer originally supplied, and that, with no evidence the technology had entered the public domain, they were likely still a competitive result worth protecting (Supreme Court of Korea, October 8, 2026, 2024Da226825). The outcome may differ if the technology has become widely known or the other side developed it independently.</p>
</div>
<div class="faq-item">
<p class="faq-q">Q. Can misappropriation be reported as a crime in South Korea?</p>
<p>A. Misappropriation under item (pa) alone is not a criminal offense. Article 18(4)(i) of the Act excludes item (pa) from the unfair competition acts that are punishable. If the materials you handed over were technical information kept confidential, trade secret crimes (Article 18(1) and (2)) may also be considered.</p>
</div>
<div class="faq-item">
<p class="faq-q">Q. How are damages calculated if the infringer does not produce its accounting records?</p>
<p>A. Korean courts may presume the infringer&#8217;s profit from sales figures and benchmarks such as the standard income rate in the National Tax Service&#8217;s expense-rate notice. In the transformer case, the appellate court found that proving the loss was extremely difficult because the defendant had no accounting records, and still awarded KRW 806,811,264 by applying a standard income rate of 9.8% to KRW 8,232,768,000 in sales from the first three deliveries (Daejeon High Court, January 24, 2024, 2022Na13337). The Supreme Court upheld that amount while noting that parts of the lower court&#8217;s reasoning were not entirely appropriate (Supreme Court of Korea, October 8, 2026, 2024Da226825). Cost savings from not buying a part can also count as the infringer&#8217;s profit (Supreme Court of Korea, April 28, 2022, 2021Da310873).</p>
</div>
<div class="faq-item">
<p class="faq-q">Q. Is every product that resembles a competitor&#8217;s product a case of misappropriation?</p>
<p>A. No. Courts have refused protection for intuitive ideas, for elements that are already widely known in the field and typical of any tool with similar functions, and for technology in the public domain (Supreme Court of Korea, October 14, 2022, 2020Da268807; Supreme Court of Korea, July 9, 2026, 2023Da290355 (main claim) and 2023Da290362 (counterclaim); Supreme Court of Korea, May 15, 2025, 2025Da202970). A finding that the defendant built its product independently can also defeat a claim of unauthorized use (Supreme Court of Korea, October 14, 2022, 2020Da268807).</p>
</div>
<div class="faq-item">
<p class="faq-q">Q. What about copying that happened before the misappropriation clause was enacted?</p>
<p>A. It can be pursued as a tort under the Civil Act. The Supreme Court of Korea held that using, without permission and contrary to commercial ethics or fair competition, results that a competitor built through considerable effort and investment is a tort under the Civil Act (Supreme Court of Korea, August 25, 2010, 2008Ma1541 (decision)). In the transformer case, the delivery ordered on March 26, 2013, before the clause took effect, was treated as a civil tort (Supreme Court of Korea, October 8, 2026, 2024Da226825).</p>
</div>
<div class="faq-item">
<p class="faq-q">Q. Is the transformer case over?</p>
<p>A. Only in part. The Supreme Court of Korea sent the claims for injunction, destruction and damages relating to the deliveries ordered on May 11, 2021 back to the Daejeon High Court and dismissed the defendant&#8217;s appeal (Supreme Court of Korea, October 8, 2026, 2024Da226825). The award of KRW 806,811,264 for the earlier deliveries stands, and the appellate court will decide the May 11, 2021 order again on remand.</p>
</div>
<p class="closing">This article summarizes Korean court decisions and statutes on the misappropriation clause of the Unfair Competition Prevention Act and its protection period, based on published judgments, and is not legal advice for any particular case. The Supreme Court decision set aside the lower court ruling in part and remanded it, so the outcome for the deliveries ordered on May 11, 2021 will be decided by the Daejeon High Court. Statutes may be amended, so in an actual case the provisions in force at the time of the conduct should be checked. Please consult Atlas Legal about your specific situation.</p>
<div class="author-box">
    <img decoding="async" class="author-avatar" src="https://atlaw.kr/wp-content/uploads/2022/12/김태진-1.png" alt="Taejin Kim, Managing Partner — Atlas Legal"></p>
<div class="author-text">
<div class="author-section-label">About the Author</div>
<div class="author-name">Taejin Kim | Managing Partner</div>
<div class="author-detail">Corporate Counseling, Corporate Disputes, White-Collar Crime</div>
<div class="author-detail">Former Public Prosecutor | Judicial Research and Training Institute, 33rd Class</div>
<div class="author-detail">Korea University LL.B. &amp; LL.M. (Criminal Law), University of California, Davis LL.M.</div>
<div class="author-detail">Atlas Legal | Incheon Songdo, South Korea</div>
<p>      <a class="author-link" href="https://atlaw.kr" target="_blank" rel="noopener noreferrer">Visit Atlas Legal Homepage →</a>
    </div>
</p></div>
</div>
<p>게시물 <a href="https://atlaw.kr/en-blog/achievement-misappropriation-protection-period-south-korea/">Copying a Supplier&#8217;s Unpatented Technology in South Korea: Supreme Court Rejects a Fixed 10-Year Limit on Protection Against Misappropriation</a>이 <a href="https://atlaw.kr/en-blog">Atlas Legal Blog</a>에 처음 등장했습니다.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>What Should You Do When a Subcontractor Doesn&#8217;t Get Paid in South Korea? Corrective Orders &#038; Settlement Agreements</title>
		<link>https://atlaw.kr/en-blog/subcontract-payment-dispute-south-korea/</link>
		
		<dc:creator><![CDATA[법무법인 아틀라스]]></dc:creator>
		<pubDate>Wed, 25 Feb 2026 03:47:22 +0000</pubDate>
				<category><![CDATA[Corporate Counseling]]></category>
		<category><![CDATA[Corporate Disputes]]></category>
		<category><![CDATA[Corporate/International]]></category>
		<category><![CDATA[Employment & Labor]]></category>
		<category><![CDATA[Unfair Competition]]></category>
		<category><![CDATA[White Collar Crime]]></category>
		<category><![CDATA[White-Collar Crime]]></category>
		<category><![CDATA[construction subcontracting South Korea]]></category>
		<category><![CDATA[Fair Transactions in Subcontracting Act]]></category>
		<category><![CDATA[KFTC corrective order]]></category>
		<category><![CDATA[promissory note discount fees]]></category>
		<category><![CDATA[subcontract payment]]></category>
		<guid isPermaLink="false">https://atlaw.kr/en-blog/?p=530</guid>

					<description><![CDATA[<p>Learn how South Korea's Fair Transactions in Subcontracting Act protects subcontractors from unpaid construction payments. A bilingual attorney explains KFTC corrective orders, deemed inspection acceptance, and settlement agreement pitfalls.</p>
<p>게시물 <a href="https://atlaw.kr/en-blog/subcontract-payment-dispute-south-korea/">What Should You Do When a Subcontractor Doesn&#8217;t Get Paid in South Korea? Corrective Orders &#038; Settlement Agreements</a>이 <a href="https://atlaw.kr/en-blog">Atlas Legal Blog</a>에 처음 등장했습니다.</p>
]]></description>
										<content:encoded><![CDATA[<p><!--  --><!--  --><br />
<!-- ATLAS_SEO_BLOCK_START --><br />
<script type="application/ld+json">{"@context":"https://schema.org","@type":"Article","headline":"What Should You Do When a Subcontractor Doesn't Get Paid in South Korea? Corrective Orders, Inspection Notices & Settlement Agreements | Atlas Legal","description":"Learn how South Korea's Fair Transactions in Subcontracting Act protects subcontractors from unpaid construction payments. A bilingual attorney explains corrective orders, deemed inspection acceptance, and settlement agreement pitfalls.","author":{"@type":"Person","@id":"https://atlaw.kr/taejin-kim/#person","name":"김태진","alternateName":"Taejin Kim","jobTitle":"대표변호사 (Managing Partner)","worksFor":{"@id":"https://atlaw.kr/#legalservice"}},"publisher":{"@type":"LegalService","@id":"https://atlaw.kr/#legalservice","name":"법무법인 아틀라스","url":"https://atlaw.kr"},"datePublished":"2026-02-25","dateModified":"2026-02-25","mainEntityOfPage":{"@type":"WebPage","@id":"https://atlaw.kr/en-blog/subcontract-payment-dispute-south-korea#webpage"},"@id":"https://atlaw.kr/en-blog/subcontract-payment-dispute-south-korea#article","inLanguage":"ko-KR"}</script><br />
<script type="application/ld+json">{"@context":"https://schema.org","@type":"FAQPage","@id":"https://atlaw.kr/en-blog/subcontract-payment-dispute-south-korea#faqpage","inLanguage":"ko-KR","mainEntity":[{"@type":"Question","name":"Can the Korea Fair Trade Commission issue a corrective order after the subcontract payment has already been settled?","acceptedAnswer":{"@type":"Answer","text":"No. The Supreme Court of Korea held that corrective orders are designed to remedy 'currently existing unlawful outcomes.' If the debt has already been extinguished through repayment, set-off, or settlement agreement, there is no remaining violation to correct (Supreme Court Decision 2001Du3099, Nov. 26, 2002). However, surcharges may still be imposed separately."}},{"@type":"Question","name":"What happens if the prime contractor fails to notify inspection results within 10 days in South Korea?","acceptedAnswer":{"@type":"Answer","text":"Under Article 9(2) of the Fair Transactions in Subcontracting Act, the goods or work are deemed to have passed inspection. The Supreme Court interpreted this provision as triggering not only deemed inspection acceptance but also the payment obligation itself within the scope of the Act (Supreme Court Decision 2001Du3099, Nov. 26, 2002). Failure to pay then exposes the prime contractor to corrective orders and surcharges."}},{"@type":"Question","name":"Can a subcontractor claim the full invoice amount after agreeing to a lower settlement figure?","acceptedAnswer":{"@type":"Answer","text":"Generally no. The Supreme Court held that when both parties confirmed the actual progress of work and agreed on a settlement amount, any debt exceeding that agreed amount is deemed never to have arisen (Supreme Court Decision 2001Du3099, Nov. 26, 2002). However, if the settlement was procured through fraud or duress, it may be challenged separately."}},{"@type":"Question","name":"What is the late payment interest rate for overdue subcontract payments in South Korea?","acceptedAnswer":{"@type":"Answer","text":"Under Article 13(8) of the Fair Transactions in Subcontracting Act, the rate is set by KFTC notice within a ceiling of 40% per annum. The current rate under KFTC Notice No. 2018-21 is 15.5% per annum. This rate is subject to change, so practitioners should verify the latest notice."}},{"@type":"Question","name":"Can a subcontractor separately claim promissory note discount fees in South Korea?","acceptedAnswer":{"@type":"Answer","text":"Yes. Article 13(6) of the Act requires the prime contractor to pay discount fees covering the period from the date of note delivery to maturity. The proviso further requires that if the note is delivered within 60 days of receiving the goods, discount fees must be paid for the period from day 61 to maturity. In Supreme Court Decision 2001Du3099, the corrective order for unpaid discount fees was upheld as lawful. The current discount rate is 7.5% per annum (KFTC Notice No. 2015-15)."}},{"@type":"Question","name":"Are promissory note discount fees extinguished by a settlement agreement on the main construction price?","acceptedAnswer":{"@type":"Answer","text":"It depends on the scope of the settlement. If the settlement only determined the main construction price, unpaid discount fees on previously issued notes remain a separate obligation. In Supreme Court Decision 2001Du3099, the corrective order for unpaid note discount fees was upheld even after the parties had reached a settlement on the principal amount. However, if the settlement comprehensively covered all obligations including discount fees, a separate claim may be difficult."}},{"@type":"Question","name":"Can surcharges and criminal penalties be imposed simultaneously for subcontracting violations in South Korea?","acceptedAnswer":{"@type":"Answer","text":"Yes. Article 30(1)(i) of the Act prescribes criminal penalties for violations of Article 13 (subcontract payment obligations), while the KFTC may separately impose surcharges under Article 25-3. Additionally, failure to comply with a corrective order is a separate criminal offense under Article 30(2)(iii)."}}]}</script><br />
<script type="application/ld+json">{"@context":"https://schema.org","@type":["LegalService","LocalBusiness"],"@id":"https://atlaw.kr/#legalservice","name":"법무법인 아틀라스","alternateName":["Atlas Legal","법무법인 아틀라스(구 케이앤피)"],"url":"https://atlaw.kr/","telephone":"+82-32-864-8300","email":"info@atlaw.kr","priceRange":"₩₩₩","address":{"@type":"PostalAddress","streetAddress":"인천타워대로 323, B동 2901호 (송도동, 센트로드)","addressLocality":"인천광역시 연수구","addressRegion":"인천광역시","postalCode":"22007","addressCountry":"KR"},"geo":{"@type":"GeoCoordinates","latitude":37.399438,"longitude":126.629812},"openingHoursSpecification":[{"@type":"OpeningHoursSpecification","dayOfWeek":["Monday","Tuesday","Wednesday","Thursday","Friday"],"opens":"09:00","closes":"18:00"}],"areaServed":[{"@type":"Place","name":"대한민국"},{"@type":"Place","name":"인천광역시"},{"@type":"Place","name":"서울특별시"},{"@type":"Place","name":"경기도"},{"@type":"Place","name":"송도국제업무지구"},{"@type":"Place","name":"청라국제도시"},{"@type":"Place","name":"영종국제도시"}]}</script><br />
<!-- ATLAS_SEO_BLOCK_END --></p>
<style>@import url('https://cdn.jsdelivr.net/gh/orioncactus/pretendard@v1.3.9/dist/web/static/pretendard.css'); /* ── Kadence 테마 컨텐츠 폭 override ── */ :root { --global-content-narrow-width: 1290px !important; } .entry-content-wrap { max-width: 1290px !important; } *, *::before, *::after { box-sizing: border-box; margin: 0; padding: 0; } :root { --navy: #0a2540; --navy2: #1a3353; --wine: #722f37; --text: #1a1f36; --muted: #697386; --rule: #e3e8ee; } body { font-family: 'Pretendard', -apple-system, BlinkMacSystemFont, 'Apple SD Gothic Neo', sans-serif; background: #fff; color: var(--text); font-size: 18px; line-height: 1.82; -webkit-font-smoothing: antialiased; } /* ── 히어로 ── */ .hero { max-width: 1000px; margin: 0 auto; padding: 72px 48px 48px; text-align: center; } .category-tag { font-size: 11px; font-weight: 700; letter-spacing: 1.5px; text-transform: uppercase; color: var(--wine); display: block; margin-bottom: 20px; } .hero h1 { font-size: 44px; font-weight: 700; line-height: 1.22; color: var(--navy); margin-bottom: 28px; word-break: keep-all; } .hero-title { font-size: 44px; font-weight: 700; line-height: 1.22; color: var(--navy); margin-bottom: 28px; word-break: keep-all; } .hero-meta { display: flex; align-items: center; justify-content: center; gap: 12px; padding-bottom: 40px; border-bottom: 1px solid var(--rule); } .hero-info { font-size: 13.5px; color: var(--text); line-height: 1.4; } .hero-info strong { color: var(--text); font-weight: 500; } /* ── 본문 ── */ .content { max-width: 1000px; margin: 0 auto; padding: 52px 48px 100px; } /* 목차 */ .toc-nav { margin-bottom: 60px; border: 1px solid #d0d5dd; border-radius: 6px; padding: 28px 32px; } .toc-label { font-size: 20px; font-weight: 700; letter-spacing: 0; text-transform: none; color: var(--navy); margin-bottom: 14px; } .toc-nav ol { list-style: none; padding-left: 0; } .toc-nav ol li { display: flex; gap: 14px; align-items: baseline; padding: 6px 0; font-size: 17px; } .toc-nav ol li::before { content: none; } .toc-nav ol li a { color: var(--text); text-decoration: none; font-weight: 400; } .toc-nav ol li a:hover { color: var(--wine); } /* 리드·요약·컨텍스트 텍스트 — 배경·선 없음 */ .lead-text { font-size: 20px; font-weight: 400; color: var(--text); line-height: 1.8; margin-bottom: 24px; } .summary-text { font-size: 18px; color: var(--text); line-height: 1.8; margin-bottom: 20px; } .context-text { font-size: 17px; color: var(--text); line-height: 1.8; margin-bottom: 52px; } /* ── 제목 ── */ h2 { font-size: 30px; font-weight: 700; color: var(--wine); margin: 68px 0 16px; word-break: keep-all; } h3 { font-size: 17px; font-weight: 700; color: var(--wine); margin: 38px 0 10px; } p { font-size: 18px; color: var(--text); line-height: 1.82; margin-bottom: 18px; } /* 이미지 — 본문 폭보다 좁은 사진도 가운데로 (테마가 img{display:block} 이라 text-align:center 로는 안 됨). author-avatar·asg-step-img 는 별도 배치라 제외 */ .content img:not(.author-avatar):not(.asg-step-img) { display: block; max-width: 100%; height: auto; margin-left: auto; margin-right: auto; } /* 표 */ table { width: 100%; border-collapse: collapse; margin: 24px 0; font-size: 14px; } thead tr { background: #fff; } th { color: var(--navy); font-weight: 600; padding: 11px 16px; text-align: left; font-size: 16px; border-bottom: 2px solid var(--navy); } td { padding: 12px 16px; border-bottom: 1px solid var(--rule); color: var(--text); font-size: 16px; } tbody tr:hover { background: #f6f9fc; } /* 불릿 리스트 */ ul, ol:not(.toc-nav ol) { padding-left: 20px; margin-bottom: 16px; } li { font-size: 18px; line-height: 1.78; margin-bottom: 6px; color: var(--text); } /* 계산 공식 — 유일한 색상 블록 */ .formula { display: flex; align-items: center; gap: 8px; background: #f6f9fc; border: 1px solid var(--rule); border-radius: 8px; padding: 28px 24px; margin: 32px 0; flex-wrap: wrap; justify-content: center; } .f-item { text-align: center; padding: 12px 18px; background: #fff; border: 1px solid var(--rule); border-radius: 5px; } .f-result { background: #fff; border: 2px solid var(--navy); } .f-num { font-size: 22px; font-weight: 700; color: var(--navy); line-height: 1.2; } .f-result .f-num { color: var(--wine); } .f-label { font-size: 11px; color: var(--text); margin-top: 4px; } .f-op { font-size: 20px; color: var(--text); padding: 0 2px; font-weight: 300; } /* FAQ — 선 구분만 */ .faq-item { border-top: 1px solid var(--rule); padding: 22px 0; } .faq-item:last-of-type { border-bottom: 1px solid var(--rule); } .faq-q { font-size: 17px; font-weight: 600; color: var(--navy); margin-bottom: 8px !important; } .faq-item p:not(.faq-q) { font-size: 17px; color: var(--text); margin: 0; line-height: 1.75; } /* 마무리 문장 */ p.closing { font-size: 15.5px; color: var(--text); margin: 40px 0 0; padding-top: 32px; border-top: 1px solid var(--rule); } /* 저자 */ .author-box { display: flex; align-items: center; gap: 14px; padding-top: 40px; margin-top: 40px; border-top: 1px solid var(--rule); } .author-avatar { width: 56px; height: 56px; border-radius: 50%; object-fit: cover; flex-shrink: 0; align-self: flex-start; } .author-text { flex: 1; } .author-name { font-size: 18px; font-weight: 600; color: var(--navy); } .author-meta { font-size: 13px; color: var(--text); margin-top: 2px; } .author-link { display: inline-block; margin-top: 8px; font-size: 15px; font-weight: 600; color: var(--wine); text-decoration: none; } .author-link:hover { text-decoration: underline; } .author-section-label { font-size: 15px; font-weight: 700; letter-spacing: 1px; text-transform: uppercase; color: var(--muted); margin-bottom: 8px; } .author-detail { font-size: 16px; color: var(--text); line-height: 1.7; margin-bottom: 1px; } @media (max-width: 640px) { body { font-size: 15px; } p { font-size: 15px; } li { font-size: 15px; } .hero { padding: 32px 14px 24px; } .hero h1 { font-size: 22px; } .hero-title { font-size: 22px; } .hero-info { font-size: 12px; } .content { padding: 28px 0 60px; } .toc-nav { margin-left: -14px; margin-right: -14px; border-radius: 0; border-left: none; border-right: none; padding: 12px 4px; margin-bottom: 28px; } .toc-label { font-size: 16px; } .toc-nav ol li { font-size: 14px; padding: 3px 0; } h2 { font-size: 20px; margin: 44px 0 10px; } h3 { font-size: 15px; margin: 24px 0 8px; } .lead-text { font-size: 16px; } .summary-text { font-size: 15px; } .context-text { font-size: 14px; } .formula { flex-direction: column; padding: 16px 12px; } .f-num { font-size: 18px; } th { font-size: 13px; padding: 8px 10px; } td { font-size: 13px; padding: 8px 10px; } .faq-q { font-size: 14px; } .faq-item p:not(.faq-q) { font-size: 14px; } .author-box { display: block; overflow: hidden; } .author-avatar { float: left; width: 36px; height: 36px; margin-right: 10px; border-radius: 50%; } .author-section-label { display: inline; font-size: 11px; letter-spacing: 0; margin: 0 3px 0 0; } .author-name { display: inline; font-size: 14px; } .author-detail { clear: both; font-size: 13px; line-height: 1.55; margin-top: 8px; margin-bottom: 1px; } .author-detail ~ .author-detail { clear: none; margin-top: 2px; } .author-link { clear: both; display: block; font-size: 13px; margin-top: 8px; } p.closing { font-size: 14px; } }</style>
<style>/* ATLAS legacy-content classes (migrated old format) -- gray boxes on white */ .direct-answer{background:#f5f5f5;border:1px solid var(--rule);border-radius:8px;padding:20px 24px;margin:0 0 24px;font-weight:500;color:var(--text);line-height:1.8;} .story-hook{background:#f5f5f5;border:1px solid var(--rule);border-radius:8px;padding:18px 22px;margin:0 0 22px;} .story-hook p{font-size:17px;color:var(--text);line-height:1.75;margin:0;} .story-detail{background:#f5f5f5;border:1px solid var(--rule);border-radius:8px;padding:22px 24px;margin:24px 0;} .story-detail h3{margin-top:0;} .statute-box{background:#f5f5f5;border:1px solid var(--rule);border-radius:8px;padding:18px 22px;margin:18px 0 22px;font-size:16px;line-height:1.7;} .statute-box .statute-title{font-weight:700;color:var(--navy);font-size:16px;margin-bottom:8px;display:block;} .statute-box .statute-text{color:var(--text);font-size:16px;margin:0;line-height:1.7;white-space:pre-line;} .statute-box .statute-text + .statute-title{margin-top:12px;} .statute-box .statute-source-title{font-weight:700;color:var(--muted);font-size:14px;margin-top:14px;margin-bottom:4px;display:block;} .statute-box .statute-source-text{color:var(--muted);font-size:14px;margin:0;line-height:1.5;font-style:italic;} .disclaimer{font-size:15px;color:var(--muted);font-style:italic;margin-bottom:15px;} figure{margin:24px 0;}figure img{max-width:100%;height:auto;border-radius:8px;} figcaption{font-size:13.5px;color:var(--muted);text-align:center;margin-top:8px;} @media (max-width:640px){.story-hook p,.statute-box{font-size:14px;}}</style>
<div class="content">
<div class="hero">
<div class="hero-title">What Should You Do When a Subcontractor Doesn&#8217;t Get Paid in South Korea? Corrective Orders &#038; Settlement Agreements</div>
<div class="hero-meta">
<div class="hero-info">
      <strong>Taejin Kim</strong> · Managing Partner, Atlas Legal
    </div>
</div>
</div>
<p>    <!-- Table of Contents --></p>
<div class="toc-nav">
<p class="toc-label">Contents</p>
<ol>
<li><a href="#section1">1. What Is Subcontract Payment Under South Korean Law?</a></li>
<li><a href="#section2">2. When Can (and Can&#8217;t) the KFTC Issue a Corrective Order?</a></li>
<li><a href="#section3">3. What Happens If the Prime Contractor Fails to Notify Inspection Results Within 10 Days?</a></li>
<li><a href="#section4">4. Does a Settlement Agreement Prevent Further Claims?</a></li>
<li><a href="#section5">5. How Are Promissory Note Discount Fees Calculated?</a></li>
<li><a href="#section6">6. How Should You Respond to a Subcontract Payment Dispute in South Korea?</a></li>
<li><a href="#section7">7. FAQ</a></li>
</ol></div>
<p>    <!-- Story Hook --></p>
<div class="story-hook" style="padding: 15px 20px; margin-bottom: 15px; border-radius: 0; background-color: #f5f5f5;">
<p><strong>Real Case:</strong> Mr. A, a South Korean construction subcontractor, completed his work but was left with nearly KRW 35 million in unpaid fees. He filed a complaint with the Korea Fair Trade Commission and obtained a corrective order. Yet the prime contractor insisted it would only pay KRW 14.5 million, arguing the parties had already reached a settlement agreement. Could Mr. A recover the rest?</p>
</p></div>
<p>    <!-- Key Answer --></p>
<div class="direct-answer" style="padding: 15px; border-radius: 0; margin-bottom: 20px; font-weight: 500; background-color: #f5f5f5;">
        <strong>Key Answer:</strong> Under South Korea&#8217;s Fair Transactions in Subcontracting Act, a KFTC corrective order can only target unpaid amounts that <em>currently remain outstanding</em>. If a valid settlement agreement has been reached, any debt exceeding the agreed amount is deemed never to have arisen. However, if the prime contractor receives goods and fails to notify inspection results within 10 days, the delivery is automatically deemed accepted and the payment obligation arises (Article 9(2); Supreme Court of Korea Decision 2001Du3099, Nov. 26, 2002).
    </div>
<p>    <!-- Story Development --></p>
<div class="story-detail" style="padding: 20px; border-radius: 0; margin: 20px 0; background-color: #f5f5f5;">
<h3>Why Could a Corrective Order Still Fail to Recover the Money?</h3>
<p class="disclaimer">* This case is based on actual proceedings. Certain facts have been adapted for educational purposes, and all client information has been anonymized.</p>
<p>In Mr. A&#8217;s case, the problem was that after construction was suspended, both parties had agreed to settle the actual work completed at KRW 16.5 million. The Supreme Court of Korea upheld the validity of this settlement, ruling that a corrective order for any amount exceeding the agreed figure was unlawful. In other words, a corrective order is not designed to confirm past violations or prevent recurrence; it exists solely to remedy unpaid amounts that <em>still exist at the time of the order</em>. This case remains a landmark precedent because it addresses three critical issues in South Korean subcontracting disputes: the binding force of settlement agreements, the 10-day inspection notice obligation, and the inherent limits of corrective orders.</p>
</p></div>
<p></p>
<h2 id="section1">1. What Is Subcontract Payment Under South Korean Law?</h2>
<p>A subcontracting relationship arises when a prime contractor (original business operator) that has received work from a project owner delegates part or all of that work to another company (subcontractor). The compensation the subcontractor is entitled to receive from the prime contractor is called &#8220;subcontract payment&#8221; (<em>hadogeup daegeum</em>).</p>
<h3>Why Does South Korea Have a Special Subcontracting Act?</h3>
<p>In South Korean construction markets, prime contractors are typically larger and hold significantly greater bargaining power than subcontractors. Subcontractors often hesitate to raise payment issues for fear of losing future contracts. The Fair Transactions in Subcontracting Act (<em>Hadogeup Georae Gongjeonghwa-e Gwanhan Beomnyul</em>) was enacted precisely to address this structural imbalance.</p>
<p>Article 1 of the Act states that its purpose is to &#8220;establish fair subcontracting transaction practices so that original business operators and subcontractors may complement each other and develop in a balanced manner from an equal footing, thereby contributing to the sound development of the national economy.&#8221; The Act goes beyond ordinary civil contract enforcement by empowering the Korea Fair Trade Commission (KFTC) to directly intervene through corrective orders and surcharges.</p>
<h3>What Is the Payment Deadline Under the Act?</h3>
<p>Under Article 13(1) of the Act, the prime contractor must pay the subcontract price within 60 days from the date of receiving the finished goods or completed work. If payment is made by promissory note and the maturity date exceeds 60 days from receipt, the prime contractor must additionally pay discount fees for the excess period (Article 13(6)).</p>
<table>
<tr>
<th>Payment Method</th>
<th>Statutory Requirement</th>
<th>Penalties for Violation</th>
</tr>
<tr>
<td>Cash payment</td>
<td>Within 60 days of receiving goods/work</td>
<td>Corrective order, surcharge, criminal penalty</td>
</tr>
<tr>
<td>Promissory note</td>
<td>Note maturity within 60 days of receipt</td>
<td>Must pay discount fees for excess period; same penalties if violated</td>
</tr>
<tr>
<td>Payment after 60 days</td>
<td>Must pay late interest for the excess period</td>
<td>Corrective order and surcharge for non-payment of late interest</td>
</tr>
</table>
<p></p>
<h2 id="section2">2. When Can (and Can&#8217;t) the KFTC Issue a Corrective Order?</h2>
<p>The existence of a past violation does not automatically entitle the KFTC to issue a corrective order. The Supreme Court of Korea has drawn a clear line around the inherent limitations of such orders.</p>
<h3>Corrective Orders Exist to Remedy &#8220;Currently Existing&#8221; Violations</h3>
<p>In its Decision 2001Du3099 (November 26, 2002), the Supreme Court held that corrective orders under Article 25(1) of the Act are intended to &#8220;rectify unlawful outcomes that currently exist in reality as a result of the relevant violation.&#8221;</p>
<p>Put simply, a corrective order is not a finding that a law was broken in the past. It can only direct payment when unpaid amounts <em>still remain outstanding at the time of the order</em>.</p>
<h3>What If the Debt Has Already Been Resolved?</h3>
<p>If the subcontract payment obligation has been extinguished for any reason, whether through repayment, set-off, or settlement agreement, the KFTC has no remaining violation to correct. The Supreme Court explicitly confirmed this principle in the aforementioned decision.</p>
<h3>Why Are Corrective Orders and Surcharges Treated Differently?</h3>
<p>This distinction is critically important in practice. The Act operates corrective orders (Article 25(1)) and surcharges (Article 25-3(1)(iii)) as separate mechanisms. Surcharges penalize the act of violation itself, so subsequent repayment or settlement does not necessarily eliminate surcharge liability.</p>
<table>
<tr>
<th>Measure</th>
<th>Corrective Order</th>
<th>Surcharge</th>
<th>Criminal Penalty</th>
</tr>
<tr>
<td>Legal basis</td>
<td>Article 25(1)</td>
<td>Article 25-3(1)(iii)</td>
<td>Article 30(1)(i)</td>
</tr>
<tr>
<td>Purpose</td>
<td>Remedy currently existing unlawful outcomes</td>
<td>Sanction the violation itself</td>
<td>Criminal sanction for the violation</td>
</tr>
<tr>
<td>Available after debt repayment?</td>
<td>No (if debt extinguished)</td>
<td>Yes (separate requirements)</td>
<td>Yes (punishes the act itself)</td>
</tr>
</table>
<p>Additionally, Article 30(2)(iii) prescribes criminal penalties for failure to comply with a corrective order. Non-compliance with an order is itself a separate criminal offense under South Korean law.</p>
<h3>What Is the Practical Takeaway for Subcontractors?</h3>
<p>A corrective order is a powerful remedy, but the unpaid amount must actually remain outstanding at the time of the complaint. Even if the prime contractor rushes to settle after a complaint is filed, late interest and unpaid discount fees accrued prior to settlement may still be subject to a separate corrective order. In the case discussed above, the court upheld the corrective order for delayed payment of partial amounts and unpaid promissory note discount fees.</p>
<p></p>
<h2 id="section3">3. What Happens If the Prime Contractor Fails to Notify Inspection Results Within 10 Days?</h2>
<p>If the prime contractor receives goods or completed work from the subcontractor and fails to notify the inspection results in writing within 10 days, the delivery is automatically deemed to have passed inspection. This is the core rule of Article 9(2) of the Act.</p>
<h3>Article 9(2): The Deemed Acceptance Rule</h3>
<p>Article 9(2) provides that the prime contractor must notify the subcontractor of inspection results in writing within 10 days from the date of receiving the goods (or, in the case of construction subcontracting, from the date of receiving notice of completion or progress). Absent notification within this period and without justifiable cause, the goods are deemed to have passed inspection.</p>
<h3>Deemed Inspection Acceptance = Payment Obligation Arises</h3>
<p>There was room for debate over whether this provision merely creates a presumption of inspection acceptance or also triggers the payment obligation. The Supreme Court provided a definitive answer.</p>
<p>In Decision 2001Du3099, the Court held that deemed inspection acceptance means, within the scope of the Act&#8217;s application, that the payment obligation also arises. In other words, deemed acceptance is not a mere procedural presumption; it carries the substantive legal effect of creating the payment obligation itself.</p>
<h3>What If the Prime Contractor Claims the Goods Were Actually Defective?</h3>
<p>Even after 10 days have passed, the prime contractor may want to argue that the delivered goods were defective. However, the burden of proof falls on the prime contractor: they must separately establish that the payment obligation did not arise. The Supreme Court noted that unless the prime contractor proves the debt never arose, the KFTC is entitled to issue corrective orders and impose surcharges.</p>
<h3>When Does the 10-Day Period Start for Construction Subcontracting?</h3>
<p>Under the parenthetical provision in Article 9(2), for construction subcontracting, the starting point is the date on which the subcontractor notifies completion or progress of work. It is therefore critical for subcontractors to document this notification in writing with a clear date. If the prime contractor fails to respond in writing within 10 days, deemed acceptance takes effect and the payment obligation begins to run from that point.</p>
<table>
<tr>
<th>Subcontracting Type</th>
<th>10-Day Start Date</th>
<th>Effect of Non-Notification</th>
</tr>
<tr>
<td>Manufacturing</td>
<td>Date of receiving goods or notice of progress</td>
<td>Deemed inspection acceptance + payment obligation arises</td>
</tr>
<tr>
<td>Construction</td>
<td>Date of receiving notice of completion or progress</td>
<td>Deemed inspection acceptance + payment obligation arises</td>
</tr>
<tr>
<td>General</td>
<td>Extendable only with justifiable cause</td>
<td>Rule applies absent justifiable cause</td>
</tr>
</table>
<p></p>
<h2 id="section4">4. Does a Settlement Agreement Prevent Further Claims?</h2>
<p>One of the most complex issues in South Korean subcontracting disputes is the binding force of settlement agreements. If the tax invoice states KRW 35 million but the parties later agreed to settle at KRW 16.5 million, which figure controls?</p>
<h3>A Settlement Must Be Based on Verified Actual Progress</h3>
<p>The Supreme Court addressed this issue head-on in Decision 2001Du3099. In that case, a director of the subcontractor had issued a tax invoice for KRW 35 million based on anticipated future work. However, the director abandoned the project mid-way, and actual progress fell far short of the invoiced amount. The parties then negotiated and agreed to settle the actual construction price at KRW 16.5 million (including VAT).</p>
<p>The Supreme Court held that, given the circumstances and content of this settlement, both parties had confirmed the actual progress at the time construction stopped and determined the price accordingly. Once such a settlement existed, any debt exceeding the agreed amount was deemed never to have arisen.</p>
<h3>Paying VAT First Does Not Mean Accepting the Full Invoice Amount</h3>
<p>The subcontractor argued that because the prime contractor had paid the KRW 3.5 million VAT portion in cash, it must have accepted the full KRW 35 million invoice. The Supreme Court rejected this argument, holding that paying the VAT component alone could not establish acceptance of the entire invoiced amount. This is a critically important ruling in practice.</p>
<h3>What About Late Interest and Discount Fees Incurred Before the Settlement?</h3>
<p>A key additional point from this case is that even though the settlement determined the scope of the main construction price, late payment interest and unpaid promissory note discount fees incurred prior to the settlement remain separate obligations. The court upheld the corrective order for these items, confirming that they survive independently of the main price settlement.</p>
<table>
<tr>
<th>Issue</th>
<th>Court&#8217;s Ruling</th>
<th>Practical Meaning</th>
</tr>
<tr>
<td>Claim for full KRW 35 million</td>
<td>Denied — settlement (KRW 16.5 million) prevails</td>
<td>Settlement based on verified progress is binding</td>
</tr>
<tr>
<td>VAT payment as evidence of full acceptance</td>
<td>Denied — VAT payment alone insufficient</td>
<td>VAT payment ≠ agreement on principal amount</td>
</tr>
<tr>
<td>Late interest on prior payments</td>
<td>Violation — corrective order upheld</td>
<td>Late interest liability exists regardless of settlement</td>
</tr>
<tr>
<td>Unpaid note discount fees</td>
<td>Violation — corrective order upheld</td>
<td>Discount fees on 60+ day notes must be paid</td>
</tr>
</table>
<h3>Why Subcontractors Should Not Rush Into Settlement Agreements</h3>
<p>Subcontractors eager to receive at least partial payment, or worried about damaging the business relationship, sometimes sign settlement agreements at a significant discount. As this decision demonstrates, once a settlement agreement is signed, recovering amounts above the agreed figure becomes extremely difficult. Legal review before signing any settlement is essential.</p>
<p></p>
<h2 id="section5">5. How Are Promissory Note Discount Fees Calculated?</h2>
<p>When a prime contractor pays subcontract fees by promissory note rather than cash, the subcontractor either has to wait until maturity or discount the note at a financial institution, absorbing the cost of early cash conversion. South Korean law requires the prime contractor to bear this cost.</p>
<h3>Why Is a Promissory Note Payment Disadvantageous? — The Basics of Note Discounting</h3>
<p>Suppose a subcontractor receives a KRW 5 million promissory note with a 3-month maturity. The subcontractor needs immediate cash for materials and labor, so it takes the note to a bank for discounting. The bank deducts interest for the 3-month period, paying out perhaps KRW 4.9 million. The KRW 100,000 difference is the &#8220;note discount fee.&#8221; The Act requires the prime contractor to compensate this fee.</p>
<h3>Article 13(6): The Legal Basis for Discount Fee Claims</h3>
<p>The main text of Article 13(6) requires that when the prime contractor pays by promissory note, discount fees for the period from the date of note delivery to the maturity date must be paid at the time the note is delivered. The proviso states that if the note is delivered within 60 days of receiving the goods, discount fees must be paid for the period from day 61 after receipt to the maturity date, payable within 60 days of receipt.</p>
<table>
<tr>
<th>Scenario</th>
<th>Provision</th>
<th>Description</th>
<th>Discount Fee Period</th>
</tr>
<tr>
<td>General rule</td>
<td>Art. 13(6) main text</td>
<td>Discount fees from note delivery date to maturity must be paid upon delivery</td>
<td>Delivery date → maturity (full period)</td>
</tr>
<tr>
<td>Note delivered within 60 days</td>
<td>Art. 13(6) proviso</td>
<td>Discount fees from day 61 after receipt to maturity, payable within 60 days</td>
<td>Day 61 after receipt → maturity</td>
</tr>
</table>
<h3>How Were Discount Fees Handled in This Case?</h3>
<p>In the Supreme Court Decision 2001Du3099 case, the prime contractor delivered two promissory notes to the subcontractor. Both notes had maturity dates exceeding 60 days from the date of receiving the work. Under Article 13(6) proviso, the prime contractor should have paid discount fees for the period from day 61 to each maturity date. However, the prime contractor delivered the notes without paying any discount fees.</p>
<p>The court upheld the KFTC&#8217;s corrective order for these unpaid discount fees, confirming that discount fee obligations arise independently from the main construction price and are not extinguished by a settlement agreement on the principal amount.</p>
<h3>What Rate Applies? — Calculating Discount Fees</h3>
<p>Discount fees are calculated based on the rate prescribed by KFTC notice. Under the current <em>Notice on Discount Rates for Subcontract Payment by Promissory Note</em> (KFTC Notice No. 2015-15), the applicable discount rate is <strong>7.5% per annum</strong>.</p>
<p>The formula is: <strong>Discount Fee = Note Amount × Annual Rate (7.5%) × Eligible Days / 365</strong></p>
<p>For example, if a KRW 5 million note matures 90 days after receipt of goods, the discount fee covers the 30-day excess beyond the 60-day threshold: KRW 5,000,000 × 7.5% × 30 / 365 = approximately KRW 30,822. Larger note amounts and longer maturities produce proportionally higher fees. The applicable rate is subject to change by KFTC notice.</p>
<h3>What Are the Penalties for Failing to Pay Discount Fees?</h3>
<p>Failure to pay discount fees constitutes a violation of Article 13 of the Act. The KFTC may impose corrective orders (Article 25(1)) and surcharges (Article 25-3(1)(iii)). Criminal penalties are also possible under Article 30(1)(i).</p>
<p>Importantly, as confirmed in this decision, the corrective order for unpaid discount fees was upheld even though the main construction price had already been settled. This means that even if the prime contractor has fully paid the principal amount, non-payment of discount fees constitutes an independent and ongoing violation.</p>
<table>
<tr>
<th>Violation</th>
<th>Enforcement Measure</th>
<th>Notes</th>
</tr>
<tr>
<td>Unpaid note discount fees</td>
<td>Corrective order (payment direction)</td>
<td>Requires outstanding unpaid amount</td>
</tr>
<tr>
<td>Unpaid note discount fees</td>
<td>Surcharge</td>
<td>Sanctions the violation itself, regardless of subsequent payment</td>
</tr>
<tr>
<td>Unpaid note discount fees</td>
<td>Criminal penalty</td>
<td>Article 30(1)(i)</td>
</tr>
<tr>
<td>Non-compliance with corrective order</td>
<td>Additional criminal penalty</td>
<td>Article 30(2)(iii)</td>
</tr>
</table>
<h3>Practical Tips for Subcontractors</h3>
<p>When receiving a promissory note, calculate immediately how many days the maturity extends beyond the date of delivery. If it exceeds 60 days from receipt, demand discount fee payment from the prime contractor right away. If discount fees are not paid upon note delivery, document the request in writing and include unpaid discount fees as a separate claim item in any subsequent KFTC complaint or civil lawsuit.</p>
<p></p>
<h2 id="section6">6. How Should You Respond to a Subcontract Payment Dispute in South Korea?</h2>
<p>Subcontract payment disputes in South Korea involve a complex interplay of KFTC proceedings, civil litigation, and potential criminal prosecution. The choice and sequencing of legal strategies can dramatically affect the outcome.</p>
<h3>Strategy for Subcontractors (the Unpaid Party)</h3>
<p>First, document the date of your progress notification in writing. If the prime contractor fails to notify inspection results within 10 days, deemed acceptance takes effect automatically. Establishing this starting date clearly is critical evidence for calculating late interest and supporting a corrective order application.</p>
<p>Second, always obtain legal review before signing any settlement agreement. As this case demonstrates, a subcontractor&#8217;s ability to claim amounts beyond the settlement figure effectively disappears once the agreement is signed.</p>
<p>Third, consider pursuing KFTC complaints and civil litigation in parallel. A corrective order provides swift relief for currently outstanding amounts, while civil litigation enables recovery of late interest, damages, and other losses.</p>
<h3>Strategy for Prime Contractors (the Paying Party)</h3>
<p>First, always notify inspection results in writing within 10 days of receiving goods or work. Oral communications or informal emails may not qualify as &#8220;written notification&#8221; under the Act. Certified mail or electronically signed documents are the safest approach.</p>
<p>Second, accurately measure actual work progress and base settlement agreements on verified figures. If construction is interrupted or disputes arise, documented measurement records become crucial evidence.</p>
<p>Third, do not underestimate late interest and discount fee obligations. As the Supreme Court confirmed, these obligations are separate from the main construction price and can independently trigger corrective orders and surcharges. The current late payment interest rate under KFTC Notice No. 2018-21 is <strong>15.5% per annum</strong>.</p>
<h3>Essential Checklist for Subcontract Payment Disputes in South Korea</h3>
<ul>
<li>Progress notification documented in writing (with clear date)</li>
<li>10-day inspection notice compliance verified</li>
<li>60-day payment deadline compliance checked</li>
<li>Promissory note maturity within 60-day threshold confirmed</li>
<li>Late interest and discount fees paid or properly claimed</li>
<li>Settlement agreement reviewed by legal counsel before signing</li>
<li>Outstanding unpaid amounts verified at time of KFTC complaint</li>
</ul>
<p>Based on extensive experience handling subcontracting disputes, missing even one or two items on this checklist can result in differences of tens of millions of Korean won. Early-stage strategic planning is the single most important factor in determining the outcome of these disputes.</p>
<p></p>
<h2 id="section7">7. FAQ</h2>
<div class="faq-block">
<div class="faq-item">
<p class="faq-q">Q1. Can the Korea Fair Trade Commission issue a corrective order after the subcontract payment has already been settled?</p>
<p>A. No. The Supreme Court held that corrective orders are designed to remedy &#8220;currently existing unlawful outcomes.&#8221; If the debt has already been extinguished through repayment, set-off, or settlement agreement, there is no remaining violation to correct (Supreme Court Decision 2001Du3099, Nov. 26, 2002). However, surcharges may still be imposed separately.</p>
</p></div>
<div class="faq-item">
<p class="faq-q">Q2. What happens if the prime contractor fails to notify inspection results within 10 days?</p>
<p>A. Under Article 9(2) of the Fair Transactions in Subcontracting Act, the goods or work are deemed to have passed inspection. The Supreme Court interpreted this as triggering not only deemed acceptance but also the payment obligation itself (Supreme Court Decision 2001Du3099, Nov. 26, 2002). The prime contractor then faces corrective orders and surcharges for non-payment.</p>
</p></div>
<div class="faq-item">
<p class="faq-q">Q3. Can a subcontractor claim the full tax invoice amount after agreeing to a lower settlement figure?</p>
<p>A. Generally no. The Supreme Court held that when both parties confirmed actual work progress and agreed on a settlement amount, any debt exceeding that figure is deemed never to have arisen (Supreme Court Decision 2001Du3099, Nov. 26, 2002). If the settlement was obtained through fraud or duress, it may be challenged separately.</p>
</p></div>
<div class="faq-item">
<p class="faq-q">Q4. What is the late payment interest rate for overdue subcontract payments in South Korea?</p>
<p>A. Under Article 13(8) of the Act, the KFTC sets the rate by notice within a ceiling of 40% per annum. The current rate under KFTC Notice No. 2018-21 is 15.5% per annum. This rate is subject to periodic revision.</p>
</p></div>
<div class="faq-item">
<p class="faq-q">Q5. Can a subcontractor separately claim promissory note discount fees?</p>
<p>A. Yes. Article 13(6) requires the prime contractor to pay discount fees covering the period from note delivery to maturity. The proviso further requires discount fees from day 61 to maturity if the note is delivered within 60 days of receipt. In Supreme Court Decision 2001Du3099, the corrective order for unpaid discount fees was upheld. The current discount rate is 7.5% per annum (KFTC Notice No. 2015-15).</p>
</p></div>
<div class="faq-item">
<p class="faq-q">Q6. Are promissory note discount fees extinguished by a settlement agreement on the main construction price?</p>
<p>A. It depends on the scope of the settlement. If the settlement only determined the main price, unpaid discount fees on previously issued notes remain a separate obligation. The Supreme Court upheld the corrective order for unpaid discount fees even after the parties settled on the principal amount (Decision 2001Du3099). However, if the settlement comprehensively covered all obligations, a separate claim may be difficult.</p>
</p></div>
<div class="faq-item">
<p class="faq-q">Q7. Can surcharges and criminal penalties be imposed simultaneously for a single subcontracting violation in South Korea?</p>
<p>A. Yes. Article 30(1)(i) prescribes criminal penalties for violating Article 13 (payment obligations), while the KFTC may separately impose surcharges under Article 25-3. Failure to comply with a corrective order is an additional criminal offense under Article 30(2)(iii).</p>
</p></div>
</p></div>
<p>Subcontract payment disputes in South Korea involve a complex interplay between KFTC administrative proceedings and civil litigation. Drawing on considerable experience with these matters, early evidence preservation and thorough review before signing any settlement agreement are the most decisive factors in determining the outcome.</p>
<p class="disclaimer" style="margin: 20px 0;">* The legal information presented in this article is intended for general guidance purposes only. Legal outcomes may vary depending on the specific facts of each case. For advice on actual legal matters, please consult a qualified attorney.</p>
<div class="author-box">
<img decoding="async" class="author-avatar" src="https://atlaw.kr/wp-content/uploads/2022/12/김태진-1.png" alt="Taejin Kim, Managing Partner — Atlas Legal"></p>
<div class="author-text">
<div class="author-section-label">About the Author</div>
<div class="author-name">Taejin Kim | Managing Partner</div>
<div class="author-detail">Corporate Counseling, Corporate Disputes, White-Collar Crime</div>
<div class="author-detail">Former Public Prosecutor | Judicial Research and Training Institute, 33rd Class</div>
<div class="author-detail">Korea University LL.B. &amp; LL.M. (Criminal Law), University of California, Davis LL.M.</div>
<div class="author-detail">Atlas Legal | Incheon Songdo, South Korea</div>
<p><a class="author-link" href="https://atlaw.kr" target="_blank" rel="noopener noreferrer">Visit Atlas Legal Homepage →</a>
</div>
</div>
</div>
<p>게시물 <a href="https://atlaw.kr/en-blog/subcontract-payment-dispute-south-korea/">What Should You Do When a Subcontractor Doesn&#8217;t Get Paid in South Korea? Corrective Orders &#038; Settlement Agreements</a>이 <a href="https://atlaw.kr/en-blog">Atlas Legal Blog</a>에 처음 등장했습니다.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>How to Set Liquidated Damages in Contracts in South Korea? Complete Guide &#124; Atlas Legal</title>
		<link>https://atlaw.kr/en-blog/how-to-set-liquidated-damages-in-contracts-in-south-korea-complete-guide-atlas-legal/</link>
		
		<dc:creator><![CDATA[법무법인 아틀라스]]></dc:creator>
		<pubDate>Sat, 11 Oct 2025 07:18:48 +0000</pubDate>
				<category><![CDATA[Contract Review]]></category>
		<category><![CDATA[Corporate Disputes]]></category>
		<category><![CDATA[Corporate/International]]></category>
		<category><![CDATA[Unfair Competition]]></category>
		<category><![CDATA[Atlas Legal]]></category>
		<category><![CDATA[contract drafting]]></category>
		<category><![CDATA[liquidated damages]]></category>
		<category><![CDATA[penalty clause]]></category>
		<category><![CDATA[South Korea]]></category>
		<guid isPermaLink="false">https://atlaw.kr/en-blog/?p=274</guid>

					<description><![CDATA[<p>Complete guide to setting liquidated damages rates (0.05%-0.25%) and caps (30%) in South Korean contracts. Learn the difference between penalties and liquidated damages under Korean law. Atlas Legal, Songdo Incheon, Korea - atlaw.kr</p>
<p>게시물 <a href="https://atlaw.kr/en-blog/how-to-set-liquidated-damages-in-contracts-in-south-korea-complete-guide-atlas-legal/">How to Set Liquidated Damages in Contracts in South Korea? Complete Guide | Atlas Legal</a>이 <a href="https://atlaw.kr/en-blog">Atlas Legal Blog</a>에 처음 등장했습니다.</p>
]]></description>
										<content:encoded><![CDATA[<p><!--  -->


<!--  --><br />
<!-- ATLAS_SEO_BLOCK_START --><br />
<script type="application/ld+json">{"@context":"https://schema.org","@type":"Article","headline":"How to Set Liquidated Damages in Contracts in South Korea? Complete Guide","description":"Comprehensive guide to liquidated damages in Korean contracts: rates, caps, penalties vs. liquidated damages, and dispute prevention strategies","author":{"@type":"Person","@id":"https://atlaw.kr/taejin-kim/#person","name":"김태진","alternateName":"Taejin Kim","jobTitle":"대표변호사 (Managing Partner)","worksFor":{"@id":"https://atlaw.kr/#legalservice"}},"publisher":{"@type":"LegalService","@id":"https://atlaw.kr/#legalservice","name":"법무법인 아틀라스","url":"https://atlaw.kr"},"datePublished":"2025-10-11","dateModified":"2026-05-03","@id":"https://atlaw.kr/en-blog/how-to-set-liquidated-damages-in-contracts-in-south-korea-complete-guide-atlas-legal#article","inLanguage":"en","mainEntityOfPage":{"@type":"WebPage","@id":"https://atlaw.kr/en-blog/how-to-set-liquidated-damages-in-contracts-in-south-korea-complete-guide-atlas-legal#webpage"},"about":["Korean liquidated damages","Korean Civil Act Article 398","Penalty clause vs liquidated damages","Reasonableness review by Korean courts","Damage estimation in contracts"]}</script><br />
<script type="application/ld+json">{"@context":"https://schema.org","@type":"FAQPage","@id":"https://atlaw.kr/en-blog/how-to-set-liquidated-damages-in-contracts-in-south-korea-complete-guide-atlas-legal#faqpage","inLanguage":"en","mainEntity":[{"@type":"Question","name":"How are liquidated damages calculated in South Korea?","acceptedAnswer":{"@type":"Answer","text":"Liquidated damages are calculated using the formula: Contract Amount × Days of Delay × Liquidated Damages Rate. For example, for a 10 million KRW contract with 15 days of delay at a 0.075% rate: 10,000,000 KRW × 15 days × 0.075% = 112,500 KRW."}},{"@type":"Question","name":"What liquidated damages rates are standard in South Korea?","acceptedAnswer":{"@type":"Answer","text":"Under the Enforcement Rules of the Act on Contracts to Which the State is a Party (Article 75), standard rates are: Construction 0.05%, Manufacturing/Purchasing 0.075%, Services 0.125%. These rates are widely accepted in private contracts as fair and reasonable standards."}},{"@type":"Question","name":"Should we set a cap on liquidated damages?","acceptedAnswer":{"@type":"Answer","text":"Yes, it is strongly recommended. Without a cap, liquidated damages can exceed the contract amount in cases of long delays. The standard cap under Korean law is 30% of the contract amount, which provides a reasonable balance between protecting creditors and ensuring predictability for debtors."}},{"@type":"Question","name":"What is the difference between penalties and liquidated damages in South Korea?","acceptedAnswer":{"@type":"Answer","text":"Under Article 398(2) of the Korean Civil Act, courts can reduce liquidated damages if they are deemed excessive. However, if the parties explicitly agree to designate them as a 'penalty', court reduction is not permitted. This distinction significantly affects enforceability and negotiating leverage."}}]}</script><br />
<script type="application/ld+json">{"@context":"https://schema.org","@type":["LegalService","LocalBusiness"],"@id":"https://atlaw.kr/#legalservice","name":"법무법인 아틀라스","alternateName":["Atlas Legal","법무법인 아틀라스(구 케이앤피)"],"url":"https://atlaw.kr/","telephone":"+82-32-864-8300","email":"info@atlaw.kr","priceRange":"₩₩₩","address":{"@type":"PostalAddress","streetAddress":"인천타워대로 323, B동 2901호 (송도동, 센트로드)","addressLocality":"인천광역시 연수구","addressRegion":"인천광역시","postalCode":"22007","addressCountry":"KR"},"geo":{"@type":"GeoCoordinates","latitude":37.399438,"longitude":126.629812},"openingHoursSpecification":[{"@type":"OpeningHoursSpecification","dayOfWeek":["Monday","Tuesday","Wednesday","Thursday","Friday"],"opens":"09:00","closes":"18:00"}],"areaServed":[{"@type":"Place","name":"대한민국"},{"@type":"Place","name":"인천광역시"},{"@type":"Place","name":"서울특별시"},{"@type":"Place","name":"경기도"},{"@type":"Place","name":"송도국제업무지구"},{"@type":"Place","name":"청라국제도시"},{"@type":"Place","name":"영종국제도시"}]}</script><br />
<!-- ATLAS_SEO_BLOCK_END --></p>
<style>@import url('https://cdn.jsdelivr.net/gh/orioncactus/pretendard@v1.3.9/dist/web/static/pretendard.css'); /* ── Kadence 테마 컨텐츠 폭 override ── */ :root { --global-content-narrow-width: 1290px !important; } .entry-content-wrap { max-width: 1290px !important; } *, *::before, *::after { box-sizing: border-box; margin: 0; padding: 0; } :root { --navy: #0a2540; --navy2: #1a3353; --wine: #722f37; --text: #1a1f36; --muted: #697386; --rule: #e3e8ee; } body { font-family: 'Pretendard', -apple-system, BlinkMacSystemFont, 'Apple SD Gothic Neo', sans-serif; background: #fff; color: var(--text); font-size: 18px; line-height: 1.82; -webkit-font-smoothing: antialiased; } /* ── 히어로 ── */ .hero { max-width: 1000px; margin: 0 auto; padding: 72px 48px 48px; text-align: center; } .category-tag { font-size: 11px; font-weight: 700; letter-spacing: 1.5px; text-transform: uppercase; color: var(--wine); display: block; margin-bottom: 20px; } .hero h1 { font-size: 44px; font-weight: 700; line-height: 1.22; color: var(--navy); margin-bottom: 28px; word-break: keep-all; } .hero-title { font-size: 44px; font-weight: 700; line-height: 1.22; color: var(--navy); margin-bottom: 28px; word-break: keep-all; } .hero-meta { display: flex; align-items: center; justify-content: center; gap: 12px; padding-bottom: 40px; border-bottom: 1px solid var(--rule); } .hero-info { font-size: 13.5px; color: var(--text); line-height: 1.4; } .hero-info strong { color: var(--text); font-weight: 500; } /* ── 본문 ── */ .content { max-width: 1000px; margin: 0 auto; padding: 52px 48px 100px; } /* 목차 */ .toc-nav { margin-bottom: 60px; border: 1px solid #d0d5dd; border-radius: 6px; padding: 28px 32px; } .toc-label { font-size: 20px; font-weight: 700; letter-spacing: 0; text-transform: none; color: var(--navy); margin-bottom: 14px; } .toc-nav ol { list-style: none; padding-left: 0; } .toc-nav ol li { display: flex; gap: 14px; align-items: baseline; padding: 6px 0; font-size: 17px; } .toc-nav ol li::before { content: none; } .toc-nav ol li a { color: var(--text); text-decoration: none; font-weight: 400; } .toc-nav ol li a:hover { color: var(--wine); } /* 리드·요약·컨텍스트 텍스트 — 배경·선 없음 */ .lead-text { font-size: 20px; font-weight: 400; color: var(--text); line-height: 1.8; margin-bottom: 24px; } .summary-text { font-size: 18px; color: var(--text); line-height: 1.8; margin-bottom: 20px; } .context-text { font-size: 17px; color: var(--text); line-height: 1.8; margin-bottom: 52px; } /* ── 제목 ── */ h2 { font-size: 30px; font-weight: 700; color: var(--wine); margin: 68px 0 16px; word-break: keep-all; } h3 { font-size: 17px; font-weight: 700; color: var(--wine); margin: 38px 0 10px; } p { font-size: 18px; color: var(--text); line-height: 1.82; margin-bottom: 18px; } /* 이미지 — 본문 폭보다 좁은 사진도 가운데로 (테마가 img{display:block} 이라 text-align:center 로는 안 됨). author-avatar·asg-step-img 는 별도 배치라 제외 */ .content img:not(.author-avatar):not(.asg-step-img) { display: block; max-width: 100%; height: auto; margin-left: auto; margin-right: auto; } /* 표 */ table { width: 100%; border-collapse: collapse; margin: 24px 0; font-size: 14px; } thead tr { background: #fff; } th { color: var(--navy); font-weight: 600; padding: 11px 16px; text-align: left; font-size: 16px; border-bottom: 2px solid var(--navy); } td { padding: 12px 16px; border-bottom: 1px solid var(--rule); color: var(--text); font-size: 16px; } tbody tr:hover { background: #f6f9fc; } /* 불릿 리스트 */ ul, ol:not(.toc-nav ol) { padding-left: 20px; margin-bottom: 16px; } li { font-size: 18px; line-height: 1.78; margin-bottom: 6px; color: var(--text); } /* 계산 공식 — 유일한 색상 블록 */ .formula { display: flex; align-items: center; gap: 8px; background: #f6f9fc; border: 1px solid var(--rule); border-radius: 8px; padding: 28px 24px; margin: 32px 0; flex-wrap: wrap; justify-content: center; } .f-item { text-align: center; padding: 12px 18px; background: #fff; border: 1px solid var(--rule); border-radius: 5px; } .f-result { background: #fff; border: 2px solid var(--navy); } .f-num { font-size: 22px; font-weight: 700; color: var(--navy); line-height: 1.2; } .f-result .f-num { color: var(--wine); } .f-label { font-size: 11px; color: var(--text); margin-top: 4px; } .f-op { font-size: 20px; color: var(--text); padding: 0 2px; font-weight: 300; } /* FAQ — 선 구분만 */ .faq-item { border-top: 1px solid var(--rule); padding: 22px 0; } .faq-item:last-of-type { border-bottom: 1px solid var(--rule); } .faq-q { font-size: 17px; font-weight: 600; color: var(--navy); margin-bottom: 8px !important; } .faq-item p:not(.faq-q) { font-size: 17px; color: var(--text); margin: 0; line-height: 1.75; } /* 마무리 문장 */ p.closing { font-size: 15.5px; color: var(--text); margin: 40px 0 0; padding-top: 32px; border-top: 1px solid var(--rule); } /* 저자 */ .author-box { display: flex; align-items: center; gap: 14px; padding-top: 40px; margin-top: 40px; border-top: 1px solid var(--rule); } .author-avatar { width: 56px; height: 56px; border-radius: 50%; object-fit: cover; flex-shrink: 0; align-self: flex-start; } .author-text { flex: 1; } .author-name { font-size: 18px; font-weight: 600; color: var(--navy); } .author-meta { font-size: 13px; color: var(--text); margin-top: 2px; } .author-link { display: inline-block; margin-top: 8px; font-size: 15px; font-weight: 600; color: var(--wine); text-decoration: none; } .author-link:hover { text-decoration: underline; } .author-section-label { font-size: 15px; font-weight: 700; letter-spacing: 1px; text-transform: uppercase; color: var(--muted); margin-bottom: 8px; } .author-detail { font-size: 16px; color: var(--text); line-height: 1.7; margin-bottom: 1px; } @media (max-width: 640px) { body { font-size: 15px; } p { font-size: 15px; } li { font-size: 15px; } .hero { padding: 32px 14px 24px; } .hero h1 { font-size: 22px; } .hero-title { font-size: 22px; } .hero-info { font-size: 12px; } .content { padding: 28px 0 60px; } .toc-nav { margin-left: -14px; margin-right: -14px; border-radius: 0; border-left: none; border-right: none; padding: 12px 4px; margin-bottom: 28px; } .toc-label { font-size: 16px; } .toc-nav ol li { font-size: 14px; padding: 3px 0; } h2 { font-size: 20px; margin: 44px 0 10px; } h3 { font-size: 15px; margin: 24px 0 8px; } .lead-text { font-size: 16px; } .summary-text { font-size: 15px; } .context-text { font-size: 14px; } .formula { flex-direction: column; padding: 16px 12px; } .f-num { font-size: 18px; } th { font-size: 13px; padding: 8px 10px; } td { font-size: 13px; padding: 8px 10px; } .faq-q { font-size: 14px; } .faq-item p:not(.faq-q) { font-size: 14px; } .author-box { display: block; overflow: hidden; } .author-avatar { float: left; width: 36px; height: 36px; margin-right: 10px; border-radius: 50%; } .author-section-label { display: inline; font-size: 11px; letter-spacing: 0; margin: 0 3px 0 0; } .author-name { display: inline; font-size: 14px; } .author-detail { clear: both; font-size: 13px; line-height: 1.55; margin-top: 8px; margin-bottom: 1px; } .author-detail ~ .author-detail { clear: none; margin-top: 2px; } .author-link { clear: both; display: block; font-size: 13px; margin-top: 8px; } p.closing { font-size: 14px; } }</style>
<style>/* ATLAS legacy-content classes (migrated old format) -- gray boxes on white */ .direct-answer{background:#f5f5f5;border:1px solid var(--rule);border-radius:8px;padding:20px 24px;margin:0 0 24px;font-weight:500;color:var(--text);line-height:1.8;} .story-hook{background:#f5f5f5;border:1px solid var(--rule);border-radius:8px;padding:18px 22px;margin:0 0 22px;} .story-hook p{font-size:17px;color:var(--text);line-height:1.75;margin:0;} .story-detail{background:#f5f5f5;border:1px solid var(--rule);border-radius:8px;padding:22px 24px;margin:24px 0;} .story-detail h3{margin-top:0;} .statute-box{background:#f5f5f5;border:1px solid var(--rule);border-radius:8px;padding:18px 22px;margin:18px 0 22px;font-size:16px;line-height:1.7;} .statute-box .statute-title{font-weight:700;color:var(--navy);font-size:16px;margin-bottom:8px;display:block;} .statute-box .statute-text{color:var(--text);font-size:16px;margin:0;line-height:1.7;white-space:pre-line;} .statute-box .statute-text + .statute-title{margin-top:12px;} .statute-box .statute-source-title{font-weight:700;color:var(--muted);font-size:14px;margin-top:14px;margin-bottom:4px;display:block;} .statute-box .statute-source-text{color:var(--muted);font-size:14px;margin:0;line-height:1.5;font-style:italic;} .disclaimer{font-size:15px;color:var(--muted);font-style:italic;margin-bottom:15px;} figure{margin:24px 0;}figure img{max-width:100%;height:auto;border-radius:8px;} figcaption{font-size:13.5px;color:var(--muted);text-align:center;margin-top:8px;} @media (max-width:640px){.story-hook p,.statute-box{font-size:14px;}}</style>
<div class="content">
<div class="hero">
<div class="hero-title">How to Set Liquidated Damages in Contracts in South Korea? Complete Guide | Atlas Legal</div>
<div class="hero-meta">
<div class="hero-info">
      <strong>Taejin Kim</strong> · Managing Partner, Atlas Legal
    </div>
</div>
</div>
<div class="toc-nav">
<p class="toc-label">Contents</p>
<ol>
<li><a href="#section1">1. What are liquidated damages and why are they necessary?</a></li>
<li><a href="#section2">2. How are liquidated damages calculated?</a></li>
<li><a href="#section3">3. What standards should be used to set liquidated damages rates?</a></li>
<li><a href="#section4">4. Why should we set a cap on liquidated damages?</a></li>
<li><a href="#section5">5. What is the difference between penalties and liquidated damages?</a></li>
<li><a href="#section6">6. How should liquidated damages be applied by industry?</a></li>
<li><a href="#section7">7. What should be reviewed when drafting contracts?</a></li>
<li><a href="#section8">8. How can liquidated damages disputes be prevented?</a></li>
<li><a href="#section9">9. FAQ</a></li>
</ol></div>
<div class="related-links">
<h3>Related Contents</h3>
<ul>
<li><a style="text-decoration:none" href="https://atlaw.kr/en-blog/category/corporate/contract-review/">Contract Drafting Services &#8211; Atlas Legal</a></li>
<li><a style="text-decoration:none" href="https://atlaw.kr/en-blog/category/corporate/corporate-counseling/">Corporate Advisory Services in South Korea</a></li>
</ul></div>
<div class="lead-text">
<p><strong>📌 Real Case:</strong> An IT startup (Company A) in Songdo, Incheon, South Korea entered into a 100 million KRW e-commerce platform development contract with a development company (Company B). The contract included a liquidated damages clause but no cap. Company B delayed development for over a year, and the calculated liquidated damages reached 120 million KRW. Company B faced a situation where even after completing the development, they would have to pay an additional 20 million KRW to Company A. When they consulted Atlas Legal, it was already too late. How could this have been prevented?</p>
</p></div>
<div class="direct-answer">
            <strong>Key Answer:</strong> Liquidated damages are calculated as &#8216;Contract Amount × Days of Delay × Liquidated Damages Rate&#8217;. Under Article 75 of the Enforcement Rules of the Act on Contracts to Which the State is a Party in South Korea, standard rates are: Construction 0.05%, Manufacturing/Purchasing 0.075%, Services 0.125%. To prevent excessive liquidated damages, it is common to set a cap of 30% of the contract amount. To prevent court reduction, parties can explicitly designate the clause as a &#8216;penalty&#8217; rather than liquidated damages. Atlas Legal has recently reviewed numerous contracts and prevented disputes by analyzing the appropriateness of liquidated damages clauses.
        </div>
<div class="story-detail">
<h3>Why did this happen?</h3>
<p>Company A and Company B used a standard contract template found online without attorney review. The liquidated damages rate was set at 0.3%, but there was no provision regarding a cap. Company B initially progressed smoothly, but the schedule was repeatedly delayed due to the departure of key developers and repeated requirement changes. When Atlas Legal conducted a post-incident analysis, we found three critical flaws in the contract. First, the absence of a liquidated damages cap created unlimited liability. Second, there was no procedure for schedule adjustment in response to requirement changes. Third, the force majeure exemption clause was unclear. If they had consulted Atlas Legal before contract execution, we could have applied the standards from the Act on Contracts to Which the State is a Party (liquidated damages rate of 0.075%, cap of 30% or 30 million KRW), included automatic schedule adjustment clauses for requirement changes, and protected both parties. We will now explain everything about liquidated damages clauses in contracts based on our practical experience.</p>
</p></div>
<p></p>
<h2 id="section1">1. What are liquidated damages and why are they necessary?</h2>
<h3>Legal Concept of Liquidated Damages</h3>
<p>Liquidated damages are compensation paid by a debtor to a creditor when contractual obligations are not fulfilled within the agreed timeframe. Article 398 of the Korean Civil Act provides that &#8220;damages for nonperformance shall be limited to ordinary damages,&#8221; while allowing parties to predetermine the amount of damages. This is called &#8216;liquidated damages,&#8217; which represents predetermined compensation for delay in performance.</p>
<h3>Why Liquidated Damages Clauses Are Essential</h3>
<p>There are three main reasons why liquidated damages clauses are essential in practice. First, they solve the difficulty of proving damages. Under the Civil Act, to claim damages, the creditor must prove the occurrence and amount of damages. In reality, it is very difficult to accurately calculate and prove damages caused by contract delays. Second, they prevent disputes. Since the amount of damages payable in case of delay is clear, debtors become more careful about performing on time, and creditors can receive compensation without the burden of separate proof, reducing disputes. Third, they enhance contract predictability. Both parties can predict the costs that will arise in case of delay at the time of contract execution, facilitating risk management.</p>
<h3>Atlas Legal&#8217;s Practical Experience</h3>
<p>Atlas Legal has reconfirmed the importance of liquidated damages clauses while reviewing contracts for companies in the Songdo International Business District. One manufacturing company had no liquidated damages clause in their equipment supply contract and, despite a 6-month delay, could not receive even 1 KRW in compensation because they could not prove actual damages. In contrast, another company with an appropriate liquidated damages clause in a contract of the same amount received compensation immediately without any dispute. Based on this experience, Atlas Legal strongly recommends including liquidated damages clauses in all contracts.</p>
<p></p>
<h2 id="section2">2. How are liquidated damages calculated?</h2>
<h3>Liquidated Damages Calculation Formula</h3>
<p>Liquidated damages are calculated using the following simple formula:</p>
<div class="calculation-box">
            <strong>Liquidated Damages = Contract Amount × Days of Delay × Liquidated Damages Rate</strong>
        </div>
<p>Looking at each element of this formula, the contract amount refers to the total agreed price, and whether VAT is included depends on the contract. Days of delay are calculated from the day after the agreed performance date to the actual performance date, including both days. The liquidated damages rate is agreed upon by the parties and is generally expressed on a daily basis.</p>
<h3>Specific Calculation Example</h3>
<p>Let&#8217;s use the e-commerce platform development contract mentioned earlier as an example. If the contract amount is 10 million KRW and the liquidated damages rate is set at 0.075% (the standard under the Act on Contracts to Which the State is a Party), the calculation for a 15-day delay is as follows:</p>
<div class="calculation-box">
<p><strong>Liquidated Damages Calculation Example</strong></p>
<p>Contract Amount: 10,000,000 KRW</p>
<p>Days of Delay: 15 days</p>
<p>Liquidated Damages Rate: 0.075% (0.75 per thousand)</p>
<p>Liquidated Damages = 10,000,000 KRW × 15 days × 0.075% = 112,500 KRW</p>
</p></div>
<p>If the delay period is 100 days, the liquidated damages become 750,000 KRW (10,000,000 KRW × 100 days × 0.075%), and if 400 days, they become 3,000,000 KRW. As the delay period lengthens, liquidated damages increase exponentially, which further highlights the importance of setting a cap.</p>
<h3>Calculation Precautions</h3>
<p>Common disputes in practice regarding liquidated damages calculation involve whether VAT is included and the starting point. Atlas Legal recommends clearly stating in contracts whether &#8220;the contract amount includes VAT&#8221; or &#8220;VAT is separate,&#8221; and clearly specifying the starting point for liquidated damages as &#8220;from the day following the performance date.&#8221; Whether to include holidays and weekends should also be specified to prevent disputes. Generally, the principle is to calculate based on calendar days including holidays and weekends.</p>
<p></p>
<h2 id="section3">3. What standards should be used to set liquidated damages rates?</h2>
<h3>Liquidated Damages Rate Standards under the Act on Contracts to Which the State is a Party</h3>
<p>While liquidated damages rates can be freely determined by the parties, when an objective and reasonable standard is needed, it is common to use the standards from Article 75 of the Enforcement Rules of the Act on Contracts to Which the State is a Party (hereinafter &#8216;State Contracts Act&#8217;). These standards have been applied in public contracts for a long time and are recognized for their fairness and reasonableness, making them widely used in private contracts as well.</p>
<table>
<thead>
<tr>
<th>Contract Type</th>
<th>Rate (per thousand)</th>
<th>Actual Percentage</th>
<th>Application Examples</th>
</tr>
</thead>
<tbody>
<tr>
<td>Construction</td>
<td>0.5</td>
<td>0.05%</td>
<td>Building, facility construction</td>
</tr>
<tr>
<td>Manufacturing/Purchasing</td>
<td>0.75</td>
<td>0.075%</td>
<td>Machinery manufacturing, goods purchase</td>
</tr>
<tr>
<td>Repair/Processing/Rental, Services</td>
<td>1.25</td>
<td>0.125%</td>
<td>Software development, consulting</td>
</tr>
<tr>
<td>Military Food Products</td>
<td>1.5</td>
<td>0.15%</td>
<td>Food supply</td>
</tr>
<tr>
<td>Transportation/Storage/Grain Processing</td>
<td>2.5</td>
<td>0.25%</td>
<td>Logistics, warehousing</td>
</tr>
</tbody>
</table>
<h3>Rationale for Differentiated Rates</h3>
<p>The reason the State Contracts Act differentiates liquidated damages rates by contract type is that the nature of contracts and the magnitude of damages from delays differ. The Supreme Court of Korea&#8217;s judgment (2001Da53059, December 11, 2001) stated that &#8220;liquidated damages are predetermined compensation for ordinary damages arising from delay in performance,&#8221; recognizing that the magnitude of ordinary damages may differ depending on the nature of the contract. For construction, which generally takes a long time and where partial delays have limited impact on the overall project, the rate is relatively low. For services or repairs, which are scheduled for short-term completion and have greater impact when delayed, the liquidated damages rate is set higher.</p>
<h3>Atlas Legal&#8217;s Negotiation Strategy</h3>
<p>Atlas Legal actively utilizes State Contracts Act standards during contract review and negotiation. Most contracting parties recognize the fairness of these standards and reach agreement without much objection. However, adjustments may be necessary considering the specifics of the contract. For example, for projects with very high uncertainty like new technology development, we lower the liquidated damages rate while more clearly setting the cap. For urgent projects, we raise the liquidated damages rate but specifically enumerate force majeure exemptions to maintain balance. Atlas Legal recently negotiated an R&#038;D contract between a Songdo bio company and a research institution, reaching agreement at 0.08% (lower than the State Contracts Act standard of 0.125%) with a cap of 20%, providing both parties with satisfactory terms.</p>
<p></p>
<h2 id="section4">4. Why should we set a cap on liquidated damages?</h2>
<h3>Problems That Can Arise Without a Cap</h3>
<p>Without a liquidated damages cap, theoretically liquidated damages can increase indefinitely. As seen in the earlier case, with a 0.3% rate and a 400-day delay, liquidated damages on a 100 million KRW contract reach 120 million KRW, creating the unreasonable situation where the debtor must pay money to the creditor even after fulfilling the contract. The Supreme Court of Korea&#8217;s judgment (91Da33858, April 28, 1992) stated that &#8220;when liquidated damages are unreasonably excessive, the court may reduce them,&#8221; but this remedy is only available through litigation. Considering litigation costs and time, setting a cap in advance is much more efficient.</p>
<h3>Cap Standards under the State Contracts Act</h3>
<p>Article 74 of the Enforcement Decree of the Act on Contracts to Which the State is a Party sets the liquidated damages cap at 30% of the contract amount. This standard is widely accepted in private contracts as well, and Atlas Legal has confirmed that most reviewed contracts follow this standard. The 30% cap is evaluated as a balance point that provides debtors with a predictable maximum loss while ensuring creditors receive substantial compensation.</p>
<div class="highlight-box">
<p><strong>Practical Effects of Setting a Cap</strong></p>
<ul>
<li>Ensuring debtor predictability: Even in the worst case, does not exceed 30% of contract amount</li>
<li>Preventing excessive liquidated damages disputes: Maintains reasonable level without litigation</li>
<li>Facilitating contract negotiation: Can persuade both parties with objective standards</li>
<li>Facilitating financial planning: Enables accurate calculation of maximum loss for risk management</li>
</ul></div>
<h3>Considerations When Setting Caps</h3>
<p>While 30% is typical, adjustments may be necessary depending on contract characteristics. Atlas Legal recommends cap adjustments in the following cases. First, when contract performance critically affects the creditor&#8217;s business (e.g., e-commerce site development with a fixed opening date), the cap can be raised to 40-50%. Second, when technical uncertainty is very high (e.g., new technology development), lowering the cap to 20% or less is reasonable. Third, for very large contract amounts, consider setting the cap as an absolute amount rather than a percentage. For example, for a 1 billion KRW contract, if 30% equals 300 million KRW and this seems excessive, it can be set as &#8220;liquidated damages shall not exceed 100 million KRW.&#8221; Atlas Legal recently set a cap of 600 million KRW (20%) for a 3 billion KRW large-scale logistics center construction contract in Songdo, Incheon, reaching agreement between both parties.</p>
<p></p>
<h2 id="section5">5. What is the difference between penalties and liquidated damages?</h2>
<h3>Concept and Characteristics of Liquidated Damages</h3>
<p>Article 398(2) of the Korean Civil Act provides that &#8220;even when the amount of damages has been predetermined, if the court deems such amount to be unreasonably excessive, it may reduce the amount.&#8221; If liquidated damages are specified in a contract but there is no separate designation as a &#8220;penalty,&#8221; they are presumed to be liquidated damages under the law. The Supreme Court of Korea&#8217;s judgment (2012Da13637, August 22, 2013) stated that &#8220;presuming them to be liquidated damages is the principle.&#8221; The key characteristic of liquidated damages is that courts can review their excessiveness and reduce them. When actual damages and the agreed liquidated damages amount are compared and found to be significantly imbalanced, courts can reduce them ex officio or based on the debtor&#8217;s claim.</p>
<h3>Concept and Characteristics of Penalties</h3>
<p>On the other hand, penalties exclude the application of Article 398(2) of the Civil Act, and courts cannot reduce them. The Supreme Court of Korea&#8217;s judgment (93Da24223, November 9, 1993) clearly stated that &#8220;when parties have agreed to a penalty, the reduction provision of Article 398(2) of the Civil Act does not apply.&#8221; To be recognized as a penalty, the contract must include explicit language such as &#8220;this provision shall be a penalty&#8221; or &#8220;has the nature of a penalty.&#8221; The simple title &#8220;liquidated damages&#8221; is not recognized as a penalty; the parties&#8217; intent must be clearly expressed.</p>
<table>
<thead>
<tr>
<th>Category</th>
<th>Liquidated Damages</th>
<th>Penalty</th>
</tr>
</thead>
<tbody>
<tr>
<td>Legal Basis</td>
<td>Civil Act Article 398(1)</td>
<td>Special agreement by parties</td>
</tr>
<tr>
<td>Court Reduction</td>
<td>Possible (Article 398(2))</td>
<td>Not possible</td>
</tr>
<tr>
<td>Proof of Damages</td>
<td>Not required (presumed)</td>
<td>Not required (irrelevant to damages)</td>
</tr>
<tr>
<td>Application Principle</td>
<td>Presumed without separate agreement</td>
<td>Explicit agreement required</td>
</tr>
<tr>
<td>Advantage to Creditor</td>
<td>Medium</td>
<td>High</td>
</tr>
<tr>
<td>Advantage to Debtor</td>
<td>High (possibility of reduction)</td>
<td>Low</td>
</tr>
</tbody>
</table>
<h3>Selection Strategy in Practice</h3>
<p>From the client&#8217;s (creditor&#8217;s) perspective, penalty agreements are advantageous. Without the possibility of court reduction, liquidated damages can be received with certainty, providing strong performance pressure on the debtor. Atlas Legal recommends penalty agreements when project success is critically dependent on delivery deadlines (e.g., online shopping malls that must open for a specific season, facilities that must be completed by a scheduled event date). However, the liquidated damages rate and cap must be set at reasonable levels to obtain the counterparty&#8217;s consent. From the contractor&#8217;s (debtor&#8217;s) perspective, liquidated damages are advantageous because they have room to request court reduction in case of unexpectedly long delays. The Supreme Court of Korea&#8217;s judgment (2001Da46216, August 23, 2002) significantly reduced liquidated damages in a case where actual damages were only about 30% of the liquidated damages. Atlas Legal advises contractors to avoid penalty agreements for projects with high technical uncertainty or heavily dependent on external factors, instead using liquidated damages with a clearly set cap. Atlas Legal recently mediated a system development contract between a Songdo AI startup and a financial institution, where the client wanted a penalty but the contractor insisted on liquidated damages, creating a standoff. We reached a compromise by using liquidated damages with a higher rate (0.15%) but a lower cap (20%). This case provided sufficient compensation to the client while offering extreme risk avoidance to the contractor.</p>
<div class="warning-box">
<p><strong>⚠️ Precautions for Penalty Agreements</strong></p>
<p>When agreeing to penalties, the liquidated damages rate and cap must be set very carefully, as court reduction is impossible. Excessive penalty agreements may cause the counterparty to refuse contract execution altogether, and even if executed, can become a source of relationship deterioration in the future. Atlas Legal recommends that penalty agreements must be within State Contracts Act standards, with caps set at 30% or less.</p>
</p></div>
<p></p>
<h2 id="section6">6. How should liquidated damages be applied by industry?</h2>
<h3>IT and Software Development</h3>
<p>IT projects can fall under &#8216;services&#8217; or &#8216;manufacturing&#8217; according to the State Contracts Act. Simple website creation or customization of existing software is typically classified as &#8216;services&#8217; (0.125%), while developing new software is classified as &#8216;manufacturing&#8217; (0.075%). While reviewing contracts for numerous IT companies in Songdo, Atlas Legal has confirmed that most apply 0.075% with a 30% cap. The characteristics of IT projects are high technical complexity and the possibility of requirement changes. Therefore, Atlas Legal recommends including the following clauses. First, an automatic schedule extension clause for requirement changes: &#8220;When additional work arises due to the client&#8217;s requirement changes, the parties shall negotiate and adjust the schedule, calculating liquidated damages based on the adjusted schedule.&#8221; Second, stage-by-stage inspection clause: &#8220;Complete inspection at each stage before proceeding to the next stage, and delays in inspection shall not be deemed the contractor&#8217;s fault.&#8221; Third, force majeure exemption clause: &#8220;Delays due to natural disasters, war, infectious diseases, insufficient client-provided materials, or third-party service failures shall be excluded from liquidated damages calculation.&#8221;</p>
<h3>Construction</h3>
<p>Construction projects typically apply 0.05%. Construction generally takes a long time and is heavily influenced by external factors such as weather, permits, and material supply, which is why a relatively low liquidated damages rate is applied. The Supreme Court of Korea&#8217;s judgment (2012Da86895, May 14, 2015) stated that &#8220;in construction contracts, delays due to force majeure circumstances such as natural disasters or delays in administrative actions by competent authorities are frequent, so reasonable liquidated damages rates considering these should be applied.&#8221; When reviewing construction contracts, Atlas Legal always checks the following. First, schedule extension clause based on weather conditions: &#8220;When work is impossible due to continuous rain for 3 days or more, or extreme cold or heat, the schedule shall be automatically extended by the corresponding number of days.&#8221; Second, permit delay exemption clause: &#8220;If permits the client agreed to obtain are delayed, that period shall be excluded from days of delay.&#8221; Third, schedule adjustment clause for design changes: &#8220;When additional construction arises due to the client&#8217;s design change requests, the parties shall negotiate and adjust the schedule.&#8221; Atlas Legal recently experienced a case where a small construction company in Songdo nearly bore the full liquidated damages when construction was delayed 6 months due to repeated client design changes, but there was no provision for this in the contract. Through our legal review applying Article 400 of the Civil Act (comparative negligence), we obtained a 70% reduction in liquidated damages.</p>
<h3>Manufacturing</h3>
<p>Manufacturing applies 0.075%. Contracts to manufacture and deliver machinery, equipment, parts, etc. fall under this category. The characteristic of manufacturing is being affected by raw material supply conditions and subcontractor delivery schedules. When reviewing manufacturing contracts, Atlas Legal recommends the following. First, raw material procurement delay exemption clause: &#8220;When raw material procurement is delayed due to circumstances beyond the contractor&#8217;s control such as natural disasters, war, strikes, or raw material production cessation, that period shall be excluded from days of delay.&#8221; Second, client inspection delay exemption clause: &#8220;When the contractor completes the product and requests inspection but inspection is delayed due to the client&#8217;s circumstances, the inspection request date shall be deemed the delivery date.&#8221; Third, linking with staged advance payment clause: &#8220;When the client&#8217;s advance payment is delayed, the delivery date shall be automatically extended by the corresponding period&#8221; to encourage the client to also comply with agreements.</p>
<h3>Services and Consulting</h3>
<p>Services and consulting typically apply 0.125%. This includes not only repair, processing, and rental of goods, but also knowledge-based services such as legal, accounting, and management consulting. The characteristic of services is that completion is scheduled within a relatively short period, and delays cause significant damage to clients. For example, if due diligence services for a company preparing for listing are delayed, the entire listing schedule can be disrupted, causing enormous damage. Atlas Legal considers the following in service contracts. First, client cooperation obligation clause: &#8220;The client must promptly provide materials and information requested by the contractor, and delays due to non-provision shall not be deemed the contractor&#8217;s fault.&#8221; Second, interim report and feedback clause: &#8220;The contractor shall regularly report interim results and receive the client&#8217;s feedback, and feedback delay periods shall be excluded from days of delay.&#8221; Atlas Legal recently handled a case where a due diligence contract between an accounting firm and a client was delayed by 3 weeks due to the client&#8217;s delay in providing materials, but because the contract had a clear provision, the accounting firm did not bear liquidated damages.</p>
<p></p>
<h2 id="section7">7. What should be reviewed when drafting contracts?</h2>
<h3>Liquidated Damages Clause Checklist</h3>
<p>The following are the liquidated damages-related checkpoints that Atlas Legal always confirms when reviewing contracts:</p>
<div class="highlight-box">
<p><strong>10 Essential Checkpoints</strong></p>
<ol>
<li><strong>Existence of liquidated damages clause:</strong> Immediately recommend revision for contracts without any liquidated damages provision</li>
<li><strong>Specification of rate:</strong> Clear numerical specification such as &#8220;0.75 per thousand&#8221; or &#8220;0.075%&#8221;</li>
<li><strong>Cap setting:</strong> Specify upper limit such as &#8220;capped at 30% of contract amount&#8221;</li>
<li><strong>Calculation basis amount:</strong> Clarify whether VAT is included</li>
<li><strong>Starting point:</strong> Clear starting time such as &#8220;from the day following the performance date&#8221;</li>
<li><strong>Penalty vs. Liquidated Damages:</strong> Check for explicit language</li>
<li><strong>Force majeure exemption clause:</strong> Enumerate specific circumstances such as natural disasters, war, infectious diseases</li>
<li><strong>Client fault exemption:</strong> Specify material non-provision, inspection delays, etc.</li>
<li><strong>Change and adjustment procedures:</strong> Methods for schedule adjustment when requirements change</li>
<li><strong>Dispute resolution clause:</strong> Arbitration or court jurisdiction for liquidated damages disputes</li>
</ol></div>
<h3>Customized Clauses by Contract Type</h3>
<p>Additional clauses should be included depending on the nature of the contract. Atlas Legal proposes the following customized clauses:</p>
<p><strong>IT/Software Development Contracts</strong></p>
<ul>
<li>Requirement change management: &#8220;Schedule adjustment after impact analysis when client makes written requirement changes&#8221;</li>
<li>Stage-by-stage inspection: &#8220;Proceed to next stage after completing inspection at each milestone; exemption for inspection delays&#8221;</li>
<li>Third-party service dependency: &#8220;Exemption for delays due to third-party service failures such as payment gateways, cloud services&#8221;</li>
</ul>
<p><strong>Construction Contracts</strong></p>
<ul>
<li>Weather conditions: &#8220;Automatic schedule extension for weather conditions making work impossible (heavy rain, heavy snow, extreme cold, extreme heat)&#8221;</li>
<li>Permit delays: &#8220;Exemption for period when permits the client agreed to obtain are delayed&#8221;</li>
<li>Design changes: &#8220;Negotiate additional schedule when client requests design changes&#8221;</li>
</ul>
<p><strong>Manufacturing Contracts</strong></p>
<ul>
<li>Raw material procurement: &#8220;Delivery adjustment when raw material supply is disrupted by force majeure&#8221;</li>
<li>Advance payment linkage: &#8220;Automatic delivery extension when client fails to pay advance payment&#8221;</li>
<li>Sample approval: &#8220;Sample production and approval period excluded from delivery period&#8221;</li>
</ul>
<h3>Documentation for Dispute Prevention</h3>
<p>As important as the contract is documentation during performance. Atlas Legal recommends always documenting the following during contract performance. First, all requirement changes should be agreed upon in writing (including email). Oral agreements are difficult to prove later and are disadvantageous in disputes. Second, when requesting materials or information from the client, use methods with delivery confirmation (certified mail, email read receipt). Third, when force majeure circumstances arise, immediately notify the counterparty and collect supporting evidence (news articles, weather bureau data, government office documents). Fourth, exchange all inspection requests and approvals in writing. Many of the litigation cases handled by Atlas Legal involved parties unable to assert legitimate rights due to insufficient documentation. In particular, a Songdo manufacturing company had delivery delayed by one month due to the client&#8217;s advance payment delay but bore the full liquidated damages because they did not notify this in writing or document it.</p>
<p></p>
<h2 id="section8">8. How can liquidated damages disputes be prevented?</h2>
<h3>Advance Risk Assessment</h3>
<p>It is important to thoroughly assess project risk factors before contract execution. Atlas Legal recommends the following risk assessment procedures. First, technical difficulty assessment. If new technology is involved or unverified methods must be used, the risk of schedule delays is high, so the liquidated damages rate should be lowered or the cap clearly set. Second, external dependency assessment. If there are many uncontrollable factors such as third-party cooperation, raw material supply, or permits, exemption clauses should be specifically enumerated. Third, client cooperation necessity assessment. If the client must provide many materials, information, or decisions, these should be specified in the contract with clear effects for non-performance. Atlas Legal recently negotiated a system integration project between a Songdo fintech startup and a bank, explicitly including the bank&#8217;s internal security review period (typically 1-2 months) in the contract schedule through advance risk assessment, preventing unnecessary liquidated damages disputes.</p>
<h3>Balance Adjustment During Negotiation</h3>
<p>If liquidated damages clauses are made unilaterally favorable only to the creditor, the counterparty may hesitate to execute the contract, or even if executed, the relationship may deteriorate. Atlas Legal proposes the following balance adjustment strategies. First, if a high liquidated damages rate is desired, set a low cap. For example, apply a high rate of 0.2% while lowering the cap to 20% to limit the contractor&#8217;s maximum risk. Second, if agreeing to a penalty, use rates at or below State Contracts Act standards. Since court reduction is impossible, lower the rate to maintain equity. Third, establish contractor protection mechanisms for client faults. While not as much as liquidated damages, specify effects (automatic schedule extension, additional cost claims, etc.) when the client fails to provide materials or delays inspection. Atlas Legal recently mediated contract negotiations between a major retailer and a logistics system developer, where the retailer wanted 0.15% and a penalty while the developer wanted 0.05% and liquidated damages. We reached a compromise at 0.1%, liquidated damages, 25% cap, and specified client inspection deadline (automatic approval deemed if not inspected within deadline).</p>
<h3>Communication During Performance</h3>
<p>Transparent and frequent communication during contract performance is key to dispute prevention. Atlas Legal recommends the following. First, regular progress reports. Report progress weekly or biweekly and share anticipated delay factors in advance. Second, early warning system. If schedule delay possibilities are detected, immediately notify the client and discuss causes and countermeasures. Notifying at the last moment leaves the client no time to prepare alternatives and deteriorates the relationship. Third, document changes. Document all requirement changes, schedule adjustments, additional work, etc. in meeting minutes or emails to eliminate room for future disputes. The most common problem Atlas Legal has observed while handling liquidated damages litigation is &#8220;said it verbally but have no documents.&#8221; In a recent case, the contractor claimed to have verbally requested materials from the client but had no evidence such as emails or meeting minutes, so the court did not recognize this and ultimately bore the full liquidated damages.</p>
<h3>Response Strategy When Disputes Arise</h3>
<p>When liquidated damages disputes arise, respond in the following steps. First, immediately consult with an attorney to identify legal issues. Review possibilities for liquidated damages reduction, client fault claims, and force majeure application. Second, collect evidence. Secure all emails, meeting minutes, work logs, and third-party documentation (weather bureau data, delivery proof, etc.). Third, attempt negotiation. Try to negotiate liquidated damages reduction or installment payments before litigation to save both parties&#8217; costs and time. Fourth, proceed with legal procedures if negotiation fails. For liquidated damages, apply for court reduction and dispute the liquidated damages themselves by asserting client fault or force majeure. Atlas Legal recently handled a case where a small Songdo manufacturing company was charged 30 million KRW in liquidated damages, proving the client&#8217;s advance payment delay (14 days) and design changes (2 times, total 20 days required) to reduce actual days of delay by 34 days and lower liquidated damages to 9 million KRW. Additionally, by arguing that liquidated damages were excessive, we obtained further court reduction (30%) to a final payment of only 6.3 million KRW.</p>
<p></p>
<h2 id="section9">9. FAQ</h2>
<div class="faq-block">
<div class="faq-item">
<p class="faq-q">Q. How are liquidated damages calculated in South Korea?</p>
<p>A. Liquidated damages are calculated using the formula: Contract Amount × Days of Delay × Liquidated Damages Rate. For example, for a 10 million KRW contract with 15 days of delay at a 0.075% rate: 10,000,000 KRW × 15 days × 0.075% = 112,500 KRW. Days of delay are calculated from the day following the performance date to the actual performance date, generally calculated as calendar days including holidays and weekends.</p>
</p></div>
<div class="faq-item">
<p class="faq-q">Q. What standards should be used to set liquidated damages rates?</p>
<p>A. Under Article 75 of the Enforcement Rules of the Act on Contracts to Which the State is a Party in South Korea, standard rates are: Construction 0.05%, Manufacturing/Purchasing 0.075%, Services 0.125%. Parties can freely set rates by agreement, but these standards are recognized as fair and reasonable. Setting rates excessively high may lead to court reduction, while setting them too low may insufficiently protect creditors.</p>
</p></div>
<div class="faq-item">
<p class="faq-q">Q. Should we set a cap on liquidated damages?</p>
<p>A. While not legally mandatory, it is strongly recommended to set a cap. Without a cap, liquidated damages can exceed the contract amount in case of long delays. The standard under Korean law is 30% of the contract amount, which is a balance point that ensures debtor predictability while providing sufficient compensation to creditors. Without a cap, extreme cases can create the unreasonable situation where debtors must pay money even after fulfilling the contract.</p>
</p></div>
<div class="faq-item">
<p class="faq-q">Q. What is the difference between penalties and liquidated damages?</p>
<p>A. Liquidated damages can be reduced by courts if deemed excessive (Civil Act Article 398(2)), but penalties agreed upon by parties cannot be reduced by courts. Creditors prefer penalties for certain performance security, while debtors prefer liquidated damages to secure reduction possibilities. To be recognized as a penalty, the contract must include explicit language such as &#8220;this provision shall be a penalty,&#8221; and the simple title &#8220;liquidated damages&#8221; is insufficient.</p>
</p></div>
<div class="faq-item">
<p class="faq-q">Q. What is an appropriate liquidated damages rate for IT projects in South Korea?</p>
<p>A. IT and software development typically apply the &#8216;manufacturing&#8217; standard of 0.075% under the State Contracts Act. However, for projects with high technical complexity and uncertainty, it is important to review cap settings and force majeure exemption clauses together. Additionally, procedures for schedule adjustment due to requirement changes, stage-by-stage inspection clauses, and exemption clauses for delays in client-provided materials should be included to prevent disputes.</p>
</p></div>
<div class="faq-item">
<p class="faq-q">Q. What happens if there is no liquidated damages clause?</p>
<p>A. Even without a liquidated damages clause, damage claims are possible under Korean Civil Act, but the creditor bears the burden of proving actual damages. Because accurately calculating and proving damages from contract delays is very difficult, it is recommended in practice to always include a liquidated damages clause. With a liquidated damages clause, predetermined amounts can be claimed without proving damages, making dispute resolution much simpler and faster.</p>
</p></div>
<div class="faq-item">
<p class="faq-q">Q. Are liquidated damages waived for delays due to force majeure?</p>
<p>A. If the contract has a force majeure exemption clause, the delay actually falls under force majeure circumstances, and this can be proven, liquidated damages for that period are waived. However, you must notify the counterparty immediately when force majeure circumstances arise and secure objective supporting evidence (weather bureau data, government announcements, news articles, etc.). Claims made after the fact without notification or with insufficient evidence may not be recognized by courts.</p>
</p></div>
<div class="faq-item">
<p class="faq-q">Q. Must liquidated damages be paid when delayed because the client did not provide materials?</p>
<p>A. If the contract has a clause stating &#8220;delays due to the client&#8217;s failure to provide materials shall be excluded from days of delay&#8221; and the contractor has evidence (email, official letter, etc.) of requesting materials in writing, that period is excluded from liquidated damages calculation. Therefore, material requests must be made in writing with specified provision deadlines. Oral requests alone are difficult to prove later and may be disadvantageous.</p>
</p></div>
<div class="faq-item">
<p class="faq-q">Q. Can liquidated damages clauses in already-executed contracts be changed?</p>
<p>A. If both parties agree, contract terms can be changed at any time. However, change agreements must be made in writing and stored with the original contract. Claims of &#8220;oral agreement&#8221; are difficult to prove in disputes. The amendment contract (or amendment agreement) must clearly state which provisions of the original contract are changed and how, with signatures and seals from both parties. Especially when changing liquidated damages rates or caps, the reasons for change and application timing (whether retroactive) must be clearly specified.</p>
</p></div>
<div class="faq-item">
<p class="faq-q">Q. How should I respond to liquidated damages disputes?</p>
<p>A. You should immediately consult with an attorney to identify legal issues. Review possibilities for liquidated damages reduction (in case of liquidated damages), client fault claims, and force majeure application. Collect all evidence including emails, meeting minutes, work logs, and third-party documentation, and attempt negotiation to reduce liquidated damages or arrange installment payments before litigation to save costs and time. Atlas Legal has extensive experience resolving such disputes and provides optimal strategies tailored to clients&#8217; situations.</p>
</p></div>
</p></div>
<p>Atlas Legal provides various corporate legal services in Songdo, Incheon, South Korea, including contract drafting, review, and dispute resolution. Liquidated damages clauses are a core mechanism for securing contract performance, and appropriate rates and caps can balance the interests of both parties. For complex or high-value contracts, it is important to consult with experts when designing liquidated damages clauses to prevent disputes and establish reasonable contractual relationships. Atlas Legal provides fair liquidated damages design based on State Contracts Act standards, along with all practically necessary clauses including force majeure exemptions, client fault exemptions, and change management to draft dispute-free contracts.</p>
<div class="author-box">
<img decoding="async" class="author-avatar" src="https://atlaw.kr/wp-content/uploads/2022/12/김태진-1.png" alt="Taejin Kim, Managing Partner — Atlas Legal"></p>
<div class="author-text">
<div class="author-section-label">About the Author</div>
<div class="author-name">Taejin Kim | Managing Partner</div>
<div class="author-detail">Corporate Counseling, Corporate Disputes, White-Collar Crime</div>
<div class="author-detail">Former Public Prosecutor | Judicial Research and Training Institute, 33rd Class</div>
<div class="author-detail">Korea University LL.B. &amp; LL.M. (Criminal Law), University of California, Davis LL.M.</div>
<div class="author-detail">Atlas Legal | Incheon Songdo, South Korea</div>
<p><a class="author-link" href="https://atlaw.kr" target="_blank" rel="noopener noreferrer">Visit Atlas Legal Homepage →</a>
</div>
</div></div>
<p>게시물 <a href="https://atlaw.kr/en-blog/how-to-set-liquidated-damages-in-contracts-in-south-korea-complete-guide-atlas-legal/">How to Set Liquidated Damages in Contracts in South Korea? Complete Guide | Atlas Legal</a>이 <a href="https://atlaw.kr/en-blog">Atlas Legal Blog</a>에 처음 등장했습니다.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
